NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 09/18/08
Floor Zip Borough Block Lot Squad # Badge #
Various 6 1 54 1 1 AO61
Inspector Building Type Basis of Inspection Photos Taken
H. Guirguis A TRU0086MN08
Contractor's Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1430 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr./TRC Environmental 08:30am - 09:30am
On arrival I met Nugent Gerald, Supervisor for LVI Environmental at the LVI field office, who informed me that a total of 1
Handler Supervisor and 34 Asbestos Handlers were on the 11”’ floor today for the first shift
The daily work schedule informed me of the following:
1, 14"' & 15'" floors: TRC Final air testing
2, la'” floor: 44 men- scraping, boxing debris
3 12"’ floor: 12 men- finish cutting raceways, boxing debris
4. 11“' floor: 34 men- demo, boxing debris.
5. 10"' floor: 13 men- putting platform across shafts, installing fall protection cables
6, 09"’ floor: 34 men- demo, boxing debris
4. Various floors : 3 men loading out boxes to ATC trailer
After signing the log book donned personal protection and accessed the work areas.
1. 11"’ floor: 20 workers were found in the process of Demo, boxing debris, inspecting the critical barriers and
re-sealing with duct tape, Demolition was not completed, Gaylord boxes and numerous poly wrapped beams were
at various locations on the floor ready to be taken. Inspection was done on the Micro trap Machines and
the Micro trap tents and on all the work area,
I used the stairs to get to the, lO’” and 9'” floor
2. 10'" floor: 10 workers were found in the process of boxing debris, inspecting the critical barriers and
re-sealing with duct tape, Demolition was completed, Gaylord boxes and numerous poly wrapped beams were
at various locations on the floor ready to be taken. Inspection was done on the Micro trap Machines and
the Micro trap tents and on all the work area,
3. 9”’ floor: 25 workers were found in the process of wrapping debris; there was still a lot of wet debris on the floor,
demolition was not completed, workers were cutting metals using power tools, HEPA vacuum attached with the
power tools, removing debris from the floor, fine spraying amended water in the work area, preparing Gaylord
boxes and wrapping beams, Gaylord boxes and numerous poly wrapped beams were at various locations on the
floor ready to be taken out Inspection was done on the Micro trap Machines and the Micro trap tents and on all the
work area.
4. I used the stairs to go back to the 11'” floor.
I exited the work area after decontaminating myself and signing the log book.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5-Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5“Publit Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000130917
NYC-WTC_000266015
OCR can misread numbers and units. Confirm readings against the page image before using them.