Asbestos inspection log, 1340 Broadway, Sep 2008

Machine-extracted title · confidence 42%

Record of asbestos inspection at 1340 Broadway near Liberty Plaza, showing inspection details.

NYC-WTC_000266012
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 09/30/08 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU0086MN08 No Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York state Zip Phone state Zip Phone NY 10018 NY 1 RunT (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:55 am to 10:10 am

I arrived at the premise at 8:55 am. LVI schedule informed that activities include start scrape, boxing debris, Eagle putting platform across shaft on 10'” floor, demo, box debris on 9'” & 8'” floors, prepping south side decons on 7'” & 6'” floors. I proceeded to the decon, followed all precautions necessary and entered containment on 10'” floor. Negative air pressure on the floor was 0.057. One worker was cleaning the shower chamber.

10'” Floor - Thirty three workers were present on the floor. Workers on ten scaffolds were observed in the area 2 wetting the ceiling with amended water, scraping the ceiling to remove the fireproofing, removing debris and dust from the ground, placing debris to the bags and into the boxes and spraying with amended water, one workers was using the hammer to remove the piece of concrete from the beam. Others were preparing additional boxes, wrapping, loading out through the waste decon. Inspection was done on micro trap machines and micro trap tents, air monitoring pumps were on. I used B stairs to proceed to the 9'” Floor. 9“’ Floor - 10 workers were on the floor. A large amount of poly wrapped beams exists on the floor. Demolition was not completed. Workers were in the process of taking down the sheetrock to reach the shaft wall on the N/E side of the work area, others were loading out the boxes and poly wrapped beams, wrapping the debris, spraying the work area with amended water, preparing additional boxes. Inspection was done on micro trap machines and tents. 20 micro trap machines were powered on and filters were clean. I used B stairwell to proceed to the 8‘” floor.

s'” Floor - Twenty one workers were performing demolition on site. Numerous amount of poly wrapped beams and Gaylord boxed were observed at various locations on the floor. Workers were wrapping air ducts, demolishing the sheetrock in the middle of the hallway and spraying with amended water, wrapping electrical cables. Others were cutting metal with electrical power tool attached to HEPA vacuum. 10 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and micro trap tents. I used B stairwell to proceed to the 7'” floor. 7‘” Floor - Three workers were observed on the floor, one person from the Eddington Security (person’s name is Jean Pascal) was observed by the B stairwell wearing a half size mask, claiming that the battery was out of the power and he couldn't use the PAPR. I advised him to leave the site immediately and return with full size respirator PAPR. No other activities on the floor. I used B stairwell to proceed to the 6'” floor. 6‘” Floor - No activities or personnel observed on the floor. 20 micro trap machines were powered on.

Using B stairwell I went back to the 10” floor. After following the decontamination procedure I signed the log book and used north hoist to get to the ground floor. I met Steve, ArnrI Javal at the TRC office and Fred Burkhadt (ATC) to report the violation of workers safety. Fred Burkhadt immediately contacted Supervisor of Eddington Security to confirm that the worker returned to the work site wearing PAPR.

NOV# Infraction Infraction Infraction ! Infraction'

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction I Supervisor’s Initial

Borough 1 “Manhattan 2=Bronx 3-Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Projeci not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130913

NYC-WTC_000266012

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000266012Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →