NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 12/02/08
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU0086MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone state Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:45 am to 9:55 am
I arrived at the premise at 8:45 am. LVI schedule informed that activities include cut walker ducts,
scrape shafts, box debris on the 9'^ & S'” floors. Eagle putting platform across shafts, demo shafts,
box debris, cut raceways, box debris on 7"’ floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment
to enter the regulated area on 8“' floor. Negative air pressure on the floor was 0.052.
Two workers were present for decon maintenance.
I used B stairwell to proceed to the 9"’ floor.
9*'' Floor - 22 workers were present on the floor. Workers were jack hammering the floor on the east side
of the work area, using crow bars to remove walker ducts, fine spraying with amended water
around the area, picking up debris, placing debris into the boxes, cutting metal into pieces with
power tools attached to the HEPA vacuum, spraying the area with amended water. Workers on scaffolds
were scraping fireproofing at the area 11, spraying with amended water, cleaning the floor from debris.
Others were resealing the floor with poly, plasticizing the ceiling of the critical barriers, preparing
and wrapping boxes. 4 Gaylord boxes were ready for load out.
Inspection was done on micro trap machines and tents.
I used B stairwell to proceed to the S*” floor.
S'^'Floor -21 workers were performing work on the floor. Workers on east side of the work area were
cutting walker ducts, fine spraying with amended water around the area, picking up debris, placing debris
into the boxes, cutting metal, using tools with HEPA vacuum attached, placing into the boxes, washing
the parts of the scaffolds, preparing and wrapping boxes. 3 Gaylord boxes were ready to be taken out.
Two leaks were observed from the north/western area of the ceiling, filters of the micro trap machines
were dirty. Supervisor was advised, and he directed workers to dispose excessive water on the floor
and replace the filters of micro traps. Inspection was done on micro trap tents.
Using B stairwell I proceeded to the 7*’ floor.
7**' Floor - 32 workers were found on the floor. Workers on scaffolds on the west side of the work
area were cutting raceways with the tools attached to the HEPA vacuum, cutting metal, spraying with
amended water, picking up debris and placing into the boxes. Carpenters were working inside
the shaft area putting platforms across shaft. Others were preparing wrapping boxes.
10 Gaylord boxes were ready for load out. 20 micro trap machines were powered on and 5 on stand by.
Inspection was done on micro trap tents.
Using B stairs I went back to the S'" floor.
After following the decontamination procedure I signed the log book and used north hoist
to return to the ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervis^^lnitial
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 - Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000130866
NYC-WTC_000265981
OCR can misread numbers and units. Confirm readings against the page image before using them.