Asbestos inspection, 130 Liberty Street, Jan 2009

Machine-extracted title · confidence 32%

Asbestos inspection record for 130 Liberty Street with project identifiers and ownership.

NYC-WTC_000265979
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 01/28/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor's Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp.. The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from; Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8;40 am to 10:15 am

I arrived at the premise at 8:40 am. LVI schedule informed that activities include cleaning work area on 5*'’ floor, demo, box debris, clear of floor on 3'“ and 2"‘'floors.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 4'” floor. Negative air pressure on the floor was 0.027. One worker was present for the decon maintenance. Using B stairwell I proceeded to the S'^loor. 3'“ Floor - 42 workers were present inside the work place, removing glass fibers and taking down the air ducts, removing metal fixtures from the ceiling at the various locations on the floor using scaffolds; removing pipes from the ceiling, cutting metal, using equipment equipped with HEPA filters, demolishing sheetrock wall, spraying around the area, picking up debris, placing into the boxes and spraying with amended water; electricians working with the electrical cables; preparing, wrapping and loading out boxes. A large amount of poly wrapped beams exists on the floor. 10 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. I observed that filters of the micro traps were dirty and electrical cables were hanging down to the floor. Handlers Supervisor was advised and three workers replaced the filters and elevated the cables. I used B stairwell to proceed to the 2"'^ floor. 2"“ Floor - 42 workers were working on the floor. Workers on scaffolds were removing the pipes and air ducts from the ceiling at the various locations of the floor, cutting into the pieces using tools with HEPA vacuum attached, picking up debris from the floor, placing into the boxes and spraying the work area with amended water. On the east side of the work area two workers were breaking the brick wall, using hammer, spraying with water. Others were wrapping beams with poly, preparing and loading out boxes. 20 still open Gaylord boxes were on the floor. Inspection was done on micro trap machines and tents. I used B stairwell to go back to the 4” floor. After following the decontamination procedure I signed the log book and used south hoist to go to the s'” floor north side decon. I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 4"’ floor. Negative air pressure on the floor was 0.065. One worker was present for the decon maintenance. 5"’ Floor - 20 workers were present on the floor. Workers on mezzanine were fine cleaning the spandular beams, columns, ceilings at the spandular beams around the perimeter, using brushes and HEPA vacuum. Other workers were cleaning the floor, picking up excess water and gross saturated debris using a wet-dry shop HEPA vacuum, resealing the B stairwell door, preparing boxes. 2 Gaylord boxes were sprayed with amended water and ready to be taken out. Inspection was done on micro trap machines and tents. After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervijo^ Initial

Borough l=Manhallan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130864

NYC-WTC_000265979

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265979Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →