NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

NYC-WTC_000265956

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000265956
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premises: Inspection Date; 130 Liberty Street 09/02/09 Floor Zip Borough Block Lot Squad # Badge# AO11 Various 1 1 54 1 1 Inspector Building Type Basis of Inspection Photos Taken N. Patel A TRU2068MN08 Yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number 462 Getty Avenue Clifton State Zip Phone Sample Number NJ 07011 (973) 772-3660 Laboratory Name Owner’s Name TRC Environmental corp. The Lower Manhattan Development Corp. Address City Address City 1430 Broadway New York One Liberty Plaza New York State Zip Phone state Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnei Javal, Sr. Proj. Mgr. / TRC Environmental 9:10 am - 10:00 am (L* fl, Cellar A & south dock) and 1:15 pm-2:00 pm (P‘ fl, Cellar A & south dock). Inspection # 1

On the 1^ floor and Cellar A, I met Mr. Eric Garcia, Foreman. There were 8 workers working to prepare work place. Total 4 workers on each site. After finishing the preparation work, They will start scrapping remnant fireproofing from the beams and columns. I used stairway B to go to south dock site.

On the south dock site, I entered to the work area with the PPE and met Mr. Geraldo, Asbestos handlers’ supervisor. There were 4 workers working at the south dock site. They were spraying amended water on the materials in the red container and moving it into the one container. They were bagging the suspect ACM during the process. Negative air pressure was -0.045.1 exited the containment after decontaminating myself and signing the log book. I met Mr. Eric Lutzker of DOL outside the south dock.

Inspection # 2

On the P' floor & Cellar A, I met Mr. Luis Castilla, Asbestos handlers’ supervisor. 6 workers on the P‘ floor & 4 workers on the Cellar A were working. They were preparing work place for scrapping renmant of fireproofing on the beams and column. I used stairway B to go to south dock site.

At the south dock, I met Mr. Paul Ortiz of ATC. There were 4 workers working to abate ACM inside the red containers. Negative Air pressure was -0.039.1 found one penetration in the plastic barrier. I told Mr. Ortiz of ATC and he took care of it. I left the site at 2:00 pm.

result

2 NOV#

NOV# SUHtKVISUK

Borough l=Manliattan 2=BroQx 3=Brooklyii 4=Queeiis 5=Rjchmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130813

NYC-WTC_000265956

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265956Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000265951

Inspection at 1430 Broadway, Liberty Plaza area; TRU2068MN08 and LMDC involved.

Similar indexed content

Compare copies and versions →