NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

Asbestos contract scope, DEP

Machine-extracted title · confidence 24%

Contract scope for asbestos monitoring and analysis services; compliance with EPA/OSHA/NYSDOL.

NYC-WTC_000265212–000265214
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

THE CITY OF NEW YORK DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF ENVIRONMENTAL COMPLIANCE ASBES rOS CONTROL PROGRAM

AIR MONITORING AND ANALYSIS SERVICE CONTRACT

SCOPE OF WORK

A. Introduction

All work perfonned under this contract must be in compliance with all applicable, relevant, and appropriate regulations, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor Occupational Safety and Health Administration (USOSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environmental Laboratory Approval Program (ELAP) and the New York City Department of Environmental Protection (NYCDEP). The services required must be provided during regular business hours and weekends. The number of samples and other tasks are estimates for bidding purposes, with no minimum guarantee. This contract will be awarded to the lowest responsive and responsible bidder. The items listed on the bid sheet reflects the types of services required.

B. Contract Term

This contract shall be in force for 120 consecutive calendar days from the NYC DEP commencement date.

C. Qualification

The laboratory must be in compliance with the National Environmental Laboratory Accreditation Conference (NELAC) standards and have certification by ELAP in the category of Airborne Asbestos by Transmission Electron Microscopy (TEM) and Phase Contrast Microscopy (PCM). Certification must be maintained for at least 6 consecutive proficiency testing rounds. Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air monitoring for at least 2 years and conducted final clearance inspections on at least 50 asbestos abatement projects. Proof of qualifications must be presented to NYC DEP upon request.

Sampling equipment must be in sufficient quantity to provide the turnaround time on each project. At a minimum the following equipment are required: air-sampling pumps (electric and battery operated) with flow rate capacities of 2 to 10 liters per minute, rotometers, mixed cellulose ester sample filters having pore size of 0.45um(TEM) , O.Sum (PCM) and electrical generators .

1

CITY_21MC100_009429940

NYC-WTC_000265212

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265212Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000284191

Contract scope document for NYC DEP Asbestos Control Program; scope of work.

Similar indexed content

Compare copies and versions →