NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, WTC site, Feb 2002

Machine-extracted title · confidence 28%

Day preliminary daily workforce report for World Trade Center project (2/2/02).

NYC-WTC_000263653
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.456th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: 2I2J02 DAY PRELIMINARY

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions: COOL AND RAINY

Labor I Equipment CLASSIFICATION QUANT, I Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER ~ 1 PROJECT ENGINEER 1 CAT 365 GRAPPLER 1 OFFICE ENGINEER CAT 375 GRAPPLER 2 FOREMEN 1 HITACHI 750 GRAPPLER 1 SAFETY OFFICER 1 HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR 1 IRON WORKERS 235 HAMMER HOE RAM 1 LOCAL 14 4 MECHANICS TRUCK 2 LOCAL 15 5 TOOL TRUCK 1 CARPENTER 1 TOOL VAN CARPENTER FOREMAN 1 ROLL OFF TEAMSTERS (FUEL, TRAILER DELIVERY) 1 DUMP TRAILERS 8 TEAMSTERS (FLATBEDS. DUMPS, AND EUKES) 14 LOW BED TRAILER MECHANICS 2 HIGH DECK TRAILERS 3 HOUSE WRECKERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 5 DELIVERIES: SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2

LIGHT TOWERS USED FOR 2.5 HOURS

Description of Work:_______________________________________________________________ ANTICIPATED WORK______________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA_____________________________________ RECORD TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE__________________ LOADS OUT:_____________________________________________________________________ YUKES:_________________________________________________________________________ DOT LOADS: ______

GRACE CONTRACTING CORP Approved By: BY; Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0201D.xls

CONFIDENTIAL, CITY_21MC100_013119682 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000263653

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000263653Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →