I GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone. N.Y. 11357-{713) 787-9000 DATE: 2/7/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER_______________________ 2 CAT 365 GRAPPLER 1 FOREMEN 1 CAT 375 BUCKET 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 14 HITACHI 750 GRAPPLER 1 IRONWORKERS HITACH11200 GRAPPLER 1 LOCAL 14 4 185 CFM COMPRESSOR •SEE NOTE LOCAL 15 6 235 HAMMER HOE RAM 1 CARPENTER MECHANICS TRUCK 2 CARPENTER FOREMAN 2 TOOL TRUCK 1 TEAMSTERS (FUEL) TOOL VAN 1 TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 15 ROLL OFF MECHANICS 2 DUMP TRAILERS 8 HOUSE WRECKERS LOW BED TRAILER HIGH DECK TRAILERS 2 fCTV oi ji WELDING TRUCK 1 iM FUEL TRUCK 1 DELIVERIES; AWISCO PICKUP TRUCKS 8 LIGHT TOWERS 5 jNOTE: LIGHT TOWERS USED 2.5 HOURS SITE MULE 3 185 CFM COMPRESSOR RAN UNMANNED DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 •NOTE: TRUCK 62 IS BEING USED BY TULLY FROM 2:30 TIL CARGO BOXES 4 END OF SHIFT. I FLAT TRUCK 1 TRUCK 99 IS USED BY TULLY ALL DAY UNDER PUMP 2 THE PEDESTRIAN BRIDGE
FLASHING ARROW BOARD PLACED AT PIER 25 AT 1:30 PM
Description_ofWorlo__________________________________________________ COMPLETED WORK_________________________________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA___________________ CONTINUED LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE LOADS OUT: 77____________________________________________________ EUKESOUT: 121 ____ __ ____________
GRACE CONTRACTING COI Approved By: BY; / Title:_______ For: SUPERINTENDENT
Jl, 609792
CONFIDENTIAL, CITY_2IMCl0 0_0 01882877 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008 NYC-WTC_000252295
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000419180
Day final workforce and equipment for 2/7/02 at World Trade site.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268645
Daily labor and equipment assignments for World Trade Center project site, Feb 7, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322587
Final day workforce and equipment listing for World Trade project, Feb 7, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322590
Day final workforce and equipment listing for World Trade project, Feb 7, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429463
Day shift workforce and equipment at World Trade Center construction.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251810
Daily workforce report listing crew and equipment at World Trade site.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305128
Daily labor/equipment summary for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322119
Night shift daily workforce and equipment roster for World Trade Center project site.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429466
Night final daily workforce and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305187
Day final workforce and equipment at World Trade, Jan 31, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305503
Night final daily workforce and equipment listing for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263632
Night shift daily workforce and equipment at World Trade site, Jan 22, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000419180
Day final workforce and equipment for 2/7/02 at World Trade site.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268645
Daily labor and equipment assignments for World Trade Center project site, Feb 7, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322587
Final day workforce and equipment listing for World Trade project, Feb 7, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322590
Day final workforce and equipment listing for World Trade project, Feb 7, 2002.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429463
Day shift workforce and equipment at World Trade Center construction.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251810
Daily workforce report listing crew and equipment at World Trade site.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000419180
Day final workforce and equipment for 2/7/02 at World Trade site.
Similar indexed content
NYC-WTC_000268645
Daily labor and equipment assignments for World Trade Center project site, Feb 7, 2002.
Similar indexed content
NYC-WTC_000322587
Final day workforce and equipment listing for World Trade project, Feb 7, 2002.
Similar indexed content
NYC-WTC_000322590
Day final workforce and equipment listing for World Trade project, Feb 7, 2002.
Similar indexed content
NYC-WTC_000429463
Day shift workforce and equipment at World Trade Center construction.
Similar indexed content