Document / 1 page

Daily labor force report, Grace Contracting, World Trade

Machine-extracted title · confidence 25%

Daily workforce report listing crew and equipment at World Trade site.

NYC-WTC_000251808
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.45 6th Road, Whitestone, N.Y. 11357-(718) 787-8000 DATE; 2/20/02 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER [FOREMEN 2 CAT 365 GRAPPLER PROJECT ENGINEER 1 ■ CAT 375 GRAPPLER SAFETY ENGINEER ■ CAT 375 BUCKET 1 LABORERS 16 ■ HITACHI 750 GRAPPLER 1 IRON WORKERS ■ HITACHI 1200 GRAPPLER 1 LOCAL 14 2 ■ 185 CFM COMPRESSOR RUNNING UNMANNED LOCAL 15 3 ■ 235 HAMMER HOE RAM 1 CARPENTER ■ MECHANICS TRUCK 1 1 CARPENTER FOREMAN ■ TOOL TRUCK TEAMSTERS (FUEL) 1 TOOL VAN MECHANICS 2 ROLL OFF HOUSE WRECKERS DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS WELDING TRUCK DELIVERIES: FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 5 I siTE MULE ~ 2 TRUCK 74 DOWN AT 3:45 AM. DRIVER CHANGED IlDUMP TRUCKS TO TRUCK 76 FOR DUF5ATION OF NIGHT l|l0 WHEEL DUMP TRUCK ~ FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK PUMP 2 -

Description of Work:________________________________________________________ FINAL WORK:_____________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA __________________________ CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE____________ NORMAL DELAYS DUE TO FDNY SIFTING OF MATERIAL________________________ TRUCKS DELAYED FROM 12:00-1:15 DUE TO VEHICLE WASH STATION SHUT DOWN FOR CLEANING OF GRATES LOADS OUT: 53

GRACE CONTRACTING CORP | Approved By: BY: Title; For: SUPERINTENDENT

DAILY WORK FORCE REPORT0220N.xls

CONFIDENTIAL, CITY_21MC100_006200352 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000251808

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251808Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →