PROJECT MONITOR LOG Part 1 1. Client: 2.Projg^^e:^^^^^ 4. Project #: 5. Work Area(s): (S' C 4a. Task #: 4rO'A*«. cf •O C. Sl'L < 6 Contractor: 7. Contractor's Foreman: 8. ATC Representative: 9. Date:
/I. C 6?, C fX?. i(. O
Type of Project: Full-Containment Tent-Containment Glovebagging Other
Size of Project: ____ Large (> 160 sq. ft., 260 lin. ft. of ACM) Small (< 160 sq.ft., 260 lin. ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 -10) N/A (If already completed)
1. Construction Decon: Yes No 2. Ceiling Pdy: Yes No 3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No 5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No 7. Negative air: Yes No 8. Pre-cleaning: Yes No 9. Prep work completed: Yes No 10. Temporary Power: Yes No 11. Other_______________ Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: Yes (Complete 1 - 5) N/A
1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other:
2. Negative air pressure > 0.02 in. of water: Yes No 3. Amended water used during removal: Yes No 4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1. 1 st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning: 3. Removal of 1 st poly layer after 1 st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No 5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1/12-hour waiting period after 3rd cleaning: Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 ■ 6) N/A (If already completed)
1. Construction of Tent: Yes No 2, Pre-cleaning: Yes No 3. Construction of Decon: Yes No 4, Negative Air: Yes No N/A 5. Prep work completed: Yes No 6. Pref-inspection passes: Yes No
Removal: 1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other: 2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
(If Glovebag Removal Check 3 through 8) 3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No 5. Amended water used: Yes No 6. Removal included cleaning and encapsulation: Yes No 7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No
Continued on Back Form NY-8 1/01
CONFIDENTIAL, CITY_21MC100_003446388 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000247782
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000247548
Monitor log for large abatement project at Broadway site, date field present.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247554
Project monitor log page for full-containment asbestos abatement, listing project staff and project type.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247676
Log for full-containment abatement project, includes location and prep details.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247644
Project monitor log with client, contractor, and project details for abatement.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177434
Form recording details for a large-scale full-containment asbestos abatement project including contractor and location data.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247714
Project monitor log; encap/abate prep and contractor details.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247688
Full-containment abatement monitor log with location and prep status.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247766
Log of large containment project with contractor and task information.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177446
Form recording details for the preparation phase of a full-containment asbestos abatement project.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247584
Monitor log page recording project type, location, and abatement phase.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247594
Full-containment abatment monitor log—client, contractor, and location fields.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247662
Project monitor log detailing client, contractor, and phase of abatement.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000247714
Project monitor log; encap/abate prep and contractor details.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247594
Full-containment abatment monitor log—client, contractor, and location fields.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177474
Project monitor log form for a large asbestos abatement project at a DEP site in September 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177454
Application form for a permit covering a large-scale full-containment asbestos abatement project.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247768
Containment abatement monitoring form with project and contractor details.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247766
Log of large containment project with contractor and task information.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000247548
Monitor log for large abatement project at Broadway site, date field present.
Similar indexed content
NYC-WTC_000247554
Project monitor log page for full-containment asbestos abatement, listing project staff and project type.
Similar indexed content
NYC-WTC_000247676
Log for full-containment abatement project, includes location and prep details.
Similar indexed content
NYC-WTC_000247644
Project monitor log with client, contractor, and project details for abatement.
Similar indexed content
NYC-WTC_000177434
Form recording details for a large-scale full-containment asbestos abatement project including contractor and location data.
Similar indexed content