NYC-WTC_000247550
Permit application form for full-containment asbestos abatement, includes project and contractor details.
5 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Full-containment abatement monitor log with client and task labels.
NYC-WTC_000247734–000247737OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
PROJECT MONITOR LOG Part 1 1. Client: 5. Work Area(s): .
Svdj OOOO-t 6. Contractor: 7. Contractor's Foreman: 8. ATC Representative: 9. Date:
b V V tV" o v( wig G'rcujo iO.
Type of Project: Full-Containment Tent-Containment Glovebagging Other
Size of Project: Large (> 160 sq. ft., 260 lin. ft. of ACM) Small t< 160 sq. ft., 260 lin. ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 -10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No 3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No 5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No 7. Negative air: Yes No 8. Pre-cleaning: Yes No 9. Prep work completed: Yes No 10. Temporary Power: Yes No 11 Other_______________ Yes No 12 Prep-Inspection Passes: Yes No (Explain why)
Removal: Yes (Complete 1 - 5) N/A
I.Type of ACM: Pipe Insulation Duct Insulation ____ Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other:
2. Negative air pressure >. 0.02 in. of waler: Yes No 3. Amended water used during removal: Yes No 4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1. 1 st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1 st cleaning: 3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No 5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1/12-hour waiting period after 3rd cleaning: Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: Yes No 2. Pre-cleaning: Yes No 3. Construction of Decon: Yes No 4. Negative Air: Yes No N/A 5. Prep work completed: Yes No 6. Pref-inspection passes: Yes No
Removal: 1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other: 2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
(If Glovebag Removal Check 3 through 8) 3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No 5. Amended water used: Yes No 6. Removal included cleaning and encapsulation; Yes No 7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No
Continued on Back Form NY-8 1/01 CONFIDENTIAL, CITY_21MC100_003446332 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000247734
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000247550
Permit application form for full-containment asbestos abatement, includes project and contractor details.
5 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247752
Project monitor log for permit application, abatement phase, site, and contractor details.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247710
Project monitor log for full-containment abatement, with project size and phase.
5 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247542
Project monitor log for abatement at 115 Broadway, with phase and contractor details.
5 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247606
Project monitor log, including type of project and abatement phase details.
5 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247748
Full-containment abatement monitor log listing project type and phase.
5 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247664
Monitor log for a large full-containment abatement project with prep and task fields.
5 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247698
Full-containment abatement monitor log with project and task identifiers.
5 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247778
Full-containment abatement monitor log with location and prep notes.
4 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247646
Project monitor log covering type, project number, and location for abatement work.
5 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247652
Project monitor log with location and prep work indicators for containment project.
5 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247684
Full-containment abatement monitor log noting project phase and location fields.
5 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000177440
Form documenting the pre-abatement sampling or removal phase of an asbestos abatement project.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247646
Project monitor log covering type, project number, and location for abatement work.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247650
Project monitor log referencing project type and size for abatement activities.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247584
Monitor log page recording project type, location, and abatement phase.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247676
Log for full-containment abatement project, includes location and prep details.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247768
Containment abatement monitoring form with project and contractor details.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000247550
Permit application form for full-containment asbestos abatement, includes project and contractor details.
Similar indexed content
NYC-WTC_000247752
Project monitor log for permit application, abatement phase, site, and contractor details.
Similar indexed content
NYC-WTC_000247710
Project monitor log for full-containment abatement, with project size and phase.
Similar indexed content
NYC-WTC_000247542
Project monitor log for abatement at 115 Broadway, with phase and contractor details.
Similar indexed content
NYC-WTC_000247606
Project monitor log, including type of project and abatement phase details.
Similar indexed content