NYC-WTC_000247636
Project monitor log detailing type of project, phase, and project location for abatement.
5 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗Full-containment abatement monitor log noting project phase and location fields.
NYC-WTC_000247684–000247687OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
PROJECT MONITOR LOG Part 1 1. Client: 2, Project Name: 4. Project #:
s/Project Addres^' 4a. Task #■
6. Contractor? 7, Contractors ^r^an: 8. A' ipresentative; 19. Dat^
ZlZ2=^ Type of Project; - Fiitl-Containment Tent-Containment Glovebagging Other
Size of Project: Large (> 160 sq. ft., 260 lin. ft. of ACM) Small (< 160 sq. ft.. 260 lin. ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal -Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section);
Preparation of Work Area: Yes (Indicate prep work performed in 1 -10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No 3 Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No 5 Removal to establish CBs: Yes No 6. Floor Poly: Yes No 7 Negative air: Yes No 8. Pre-cleaning: Yes No 9 Prep work completed: Yes No 10 Temporary Power: Yes No 11. Other_______________ Yes No 12, Prep-Inspection Passes: Yes No (Explain why)
Removal: Yes (Complete 1 - 5) N/A
I .Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other:
2. Negative air pressure > 0.02 in of water: Yes No 3. Amended water used during removal: Yes No 4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1.____ 1 st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning: 3. Removal of 1st poly layer after 1sl cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No 5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1/12-hour waiting period after 3rd cleaning: Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section);
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1 Construction of Tent: Yes No 2. Pre-cleaning: Yes No 3 Construction of Decon: Yes No 4. Negative Air: Yes No N/A 5 Prep work completed: Yes No 6. Pref-inspection passes: Yes No
Removal: 1 Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation T ransite Boards Floor Tile Other: 2 Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
(If Glovebag Removal Check 3 through 8) 3 Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No 5 Amended water used: Yes No 6. Removal included cleaning and encapsulation:__ Yes No 7 Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No
Continued on Back Form NY-8 1/01
CONFIDENTIAL, CITY_21MC100_003446270 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000247684
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000247636
Project monitor log detailing type of project, phase, and project location for abatement.
5 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247606
Project monitor log, including type of project and abatement phase details.
5 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247652
Project monitor log with location and prep work indicators for containment project.
5 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247672
Full containment abatement project monitor log with project and task sections.
5 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247702
Full-containment abatement project monitor log, includes location and prep.
5 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247690
Full-containment abatement monitor log; project details and task references.
5 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247710
Project monitor log for full-containment abatement, with project size and phase.
5 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247598
Monitor log page for full-containment abatement; captures personnel and project details.
4 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247618
Project monitor log for a large abatement project with contractor and task details.
5 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247768
Containment abatement monitoring form with project and contractor details.
5 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247798
Containment abatement project monitor with prep and location fields.
5 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247774
Containment abatement monitor log including client, contractor, and date.
5 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000247784
Project monitor log for full-containment abatement with project and task data.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247811
Containment abatement monitor form listing contractor and date.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247550
Permit application form for full-containment asbestos abatement, includes project and contractor details.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247624
Project monitor log for a full containment abatement project, listing contractor and task info.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247574
Monitor log form capturing project type, phase, and location for abatement.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247606
Project monitor log, including type of project and abatement phase details.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000247636
Project monitor log detailing type of project, phase, and project location for abatement.
Similar indexed content
NYC-WTC_000247606
Project monitor log, including type of project and abatement phase details.
Similar indexed content
NYC-WTC_000247652
Project monitor log with location and prep work indicators for containment project.
Similar indexed content
NYC-WTC_000247672
Full containment abatement project monitor log with project and task sections.
Similar indexed content
NYC-WTC_000247702
Full-containment abatement project monitor log, includes location and prep.
Similar indexed content