NYC-WTC_000247790
Containment abatement project monitor form with project and task details.
5 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Project monitor log for full containment abatement, including location and preparation fields.
NYC-WTC_000247640–000247643OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
y L. I A PROJECT MONITOR LOG Part 1 1. Client: 2. 5. Work Area(s): T LvT____________ fl O Q 2^
6. Contractor: 7. Contractor's Foreman: 8. ATC Representative 9. Date:
COiV. i---- Type of Project; Full-Containment T 8nt-Containment Glovebagging Other
Size of Project; Large (> 160 sq. ft., 260 lin. ft. of ACM) Small (< 160 sq. ft., 260 lin. ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area; Yes (Indicate prep work performed in 1 -10) N.fA (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No 3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No 5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No 7. Negative air: Yes No 8. Pre-cleaning: Yes No 9 Prep work completed: Yes No 10. Temporary Power. Yes No 11. Cither_______________ Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: Yes (Complete 1 - 5) N/A
1. Type of ACM: Pipe Insulation Duct Insulation ____ Fireproofing Ceiling Tile Floor Tile Other: Boiler Insulation Transite Boards —r 2. Negative air pressure > 0.02 in. of water: Yes No 3. Amended water used during removal: Yes No 4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1. 1st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning: 3. Removal of 1st poly layer after 1st cleaning; Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes Ni 5. Removal of 2nd poly layer after 2nd cleaning; Yes No 6. 1/t2-hour waiting period after 3rd cleaning: Yes N
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area; Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: ___ Yes_____ No 2. Pre-cleaning; Yes No 3. Construction of Decon; Yes No 4. Negative Air: Yes No N/A 5. Prep work completed: Yes No 6. Pref-inspection passes: Yes No
Removal: I.Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other: 2, Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through
(If Glovebag Removal Check 3 through 8) 3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No 5. Amended water used; Yes No 6 Removal included cleaning and encapsulation: Yes Nc 7. Open/damaged ends of insul, sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes Nc
Continued on Back Form NY
CONFIDENTIAL, CITY_21MC100_003446216 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000247640
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000247790
Containment abatement project monitor form with project and task details.
5 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247684
Full-containment abatement monitor log noting project phase and location fields.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247618
Project monitor log for a large abatement project with contractor and task details.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247658
Full-containment abatement project monitor log including location and prep notes.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247568
Project monitor log page recording scope and responsible parties for containment.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247624
Project monitor log for a full containment abatement project, listing contractor and task info.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247646
Project monitor log covering type, project number, and location for abatement work.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247716
Full-containment abatement log page with location and prep requirements.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247690
Full-containment abatement monitor log; project details and task references.
5 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177442
Application form for a permit covering a large-scale full-containment asbestos abatement project.
5 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247652
Project monitor log with location and prep work indicators for containment project.
5 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247678
Project monitor log for full containment abatement, client's details and project scope.
5 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000247598
Monitor log page for full-containment abatement; captures personnel and project details.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000129388
Collection of chain of custody forms for asbestos samples stored in DEP Box 19.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247698
Full-containment abatement monitor log with project and task identifiers.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247694
Full-containment abatement monitor log showing project type and prep steps.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177446
Form recording details for the preparation phase of a full-containment asbestos abatement project.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177448
Form documenting the construction of decontamination units as part of a full-containment asbestos abatement project.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000247790
Containment abatement project monitor form with project and task details.
Similar indexed content
NYC-WTC_000247684
Full-containment abatement monitor log noting project phase and location fields.
Similar indexed content
NYC-WTC_000247618
Project monitor log for a large abatement project with contractor and task details.
Similar indexed content
NYC-WTC_000247658
Full-containment abatement project monitor log including location and prep notes.
Similar indexed content
NYC-WTC_000247568
Project monitor log page recording scope and responsible parties for containment.
Similar indexed content