NYC-WTC_000247716
Full-containment abatement log page with location and prep requirements.
5 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗Project monitor log for full containment abatement, with project, task, and contractor details.
NYC-WTC_000247628–000247633OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
<wrc 1, Client: ASSOCIATES INC PROJECT MONITOR LOG 4. Project#: 5, Work Area(s): Part 1
4a. Task #: ^3 <9 O O L 6. Contractor: 7. Contractor's Foreman: 8. ATC Representative: 9 Date:
/I G* , •v O V/ C 9 - Xi .
Type of Project: Full-Containment Tent-Containment Glovebagging Other
Size of Project: Large (> 160 sq, ft., 260 lin. ft. of ACM) Small (< 160 sq. fl., 260 lin, ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section);
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No 3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No 5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No 7. Negative air: Yes No 8. Pre-cleaning: Yes No 9. Prep work completed: Yes No 10. Temporary Power: Yes No 11. Other_______________ Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal; Yes (Complete 1 - 5) N/A
1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other:
2. Negative air pressure >. 0.02 in. of water: Yes No 3. Amended water used during removal: Yes No 4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No Cleaning; Yes (Complete 1 - 6 ) N/A
1. 1 st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning: 3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No 5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1/12-hour waiting period after 3rd cleaning: Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area^ Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: Yes No J. ^re-cleaning: Yes- No 3. Construction of Decon: No 4. Negative Air: Yes No N/A 5. Prep work compli Yes No 6. Pref-inspection passes: No
" Removal: ition Duct Insujatjdh -'S-^j^FiregjprtlfTg Ceiling Tile <^^^Tile Insulation Other: or Removal: Gross removal within tent Glovebag remqval wrtfiin tent (check 3 through 8)
J* (If Glovebag Remoyaf Cfieck 3 through 8)'” 3. Glovebags smoke-tested: " Yes ■'iJ^^Qle^^ags attached to smoot^u^ce Yes No 5. Amended waterysed: - ___ - ^es Removal included cleaning>w3$ij^sulation: Yes No 7. Open/damag^ends of in^ sreale’d: 5^ hlo- ■ . 8. Glovebags vacuumed, dOeJ^S^ed: Yes No Continued on Back Form NY-8 1/01
CONFIDENTIAL, CITY_21MC100_003446202
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000247628
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000247716
Full-containment abatement log page with location and prep requirements.
5 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247618
Project monitor log for a large abatement project with contractor and task details.
5 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247768
Containment abatement monitoring form with project and contractor details.
5 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247724
Containment/abatement monitor log with location and prep status.
6 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247752
Project monitor log for permit application, abatement phase, site, and contractor details.
6 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247811
Containment abatement monitor form listing contractor and date.
5 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247678
Project monitor log for full containment abatement, client's details and project scope.
5 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247684
Full-containment abatement monitor log noting project phase and location fields.
5 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247610
Project monitor log for a full containment asbestos abatement permit application, includes task, contractor, and date fields.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247652
Project monitor log with location and prep work indicators for containment project.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247606
Project monitor log, including type of project and abatement phase details.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247636
Project monitor log detailing type of project, phase, and project location for abatement.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000247730
Containment-abatement monitor log; project and contractor details.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000129388
Collection of chain of custody forms for asbestos samples stored in DEP Box 19.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177470
Project monitor log form for a large asbestos abatement project at a DEP site in September 2002.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247774
Containment abatement monitor log including client, contractor, and date.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000129388
Collection of chain of custody forms for asbestos samples stored in DEP Box 19.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000129388
Collection of chain of custody forms for asbestos samples stored in DEP Box 19.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000247716
Full-containment abatement log page with location and prep requirements.
Similar indexed content
NYC-WTC_000247618
Project monitor log for a large abatement project with contractor and task details.
Similar indexed content
NYC-WTC_000247768
Containment abatement monitoring form with project and contractor details.
Similar indexed content
NYC-WTC_000247724
Containment/abatement monitor log with location and prep status.
Similar indexed content
NYC-WTC_000247752
Project monitor log for permit application, abatement phase, site, and contractor details.
Similar indexed content