Permit application, full containment abatement

Machine-extracted title · confidence 25%

Project monitor log for a full containment abatement project, listing contractor and task info.

NYC-WTC_000247624–000247627
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PROJECT MONITOR LOG Part 1 1, Client: 2. Project Name: 4. Project#:. 5, Work Area(s): 7; A /2 3. Project Address:^ 4a. Task#: >

6. Contractor: 7. Contractor's Foreman: epresentative; 9. Date:

/ACPLxry

Type of Project; Full-Containment Tent-Containment Glovebagging Other

Size of Project: Large {> t60 sq. ft.. 260 lin. ft. of ACM) Small (< t60 sq.ft., 260 lin. ft.)

Phase of Abatement; Pre-abatement Sampling Prep Removal Cleaning

Encapsulation Waste Load-out Finals

FULL-CONTAINMENT ABATEMENT

Work Area Location (floor, room, section): /rJ

Preparation of Work Area: Yes (Indicate prep work performed in 1 -10) N/A (If already completed)

1. Construction of Decon: ____ Yes No 2. Ceiling Poly: Yes No 3. Critical Barriers (CBs): ____ Yes No 4. Wall Poly: Yes No 5. Removal to establish CBs: ____ Yes No 6. Floor Poly. Yes No 7. Negative air: ____ Yes No 8. Pre-cleaning: Yes No 9, Prep work completed: ____ Yes No to. Temporary Power: Yes No 11, Other_______________ ____ Yes No 12. Prep-Inspection Passes: Yes No (Explain why)

Removal: (Complete 1 - 5) N/A

1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other:

2. Negative air pressure > 0.02 in. of water: Yes No 3 Amended water used during removal: Yes No 4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No

Cleaning: Yes (Complete 1 - 6) N/A

1. 1st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning: 3. Removal of 1st poly layer after 1st cleaning. Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No 5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1/12-hour waiting period after 3rd cleaning: Yes No

TENT-CONTAINMENT ABATEMENT

Work Area Location (floor, room, section):

Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)

1. Construction of Tent: Yes No 2. Pre-cleaning: Yes No 3. Construction of Decon: Yes No 4. Negative Air: Yes No N/A 5. Prep work completed: Yes No 6. Pref-inspection passes: Yes No Removal: 1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other: 2. Method or Removal: Gross removal within tent Glovebag removal within lent (check 3 through 8)

(If Glovebag Removal Check 3 through 8) 3. Glovebags smoke-tested: Yes No 4 Glovebags attached to smooth surface: Yes No 5. Amended waler used: Yes No 6 Removal included cleaning and encapsulation: Yes No 7. Open/damaged ends of insul. sealed: Yes No 8 Glovebags vacuumed, double-bagged: Yes No

Continued on Back Form NY-8 1/01 CONFIDENTIAL, CITY_21MC100_003446198

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000247624

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000247624Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →