NYC-WTC_000247554
Project monitor log page for full-containment asbestos abatement, listing project staff and project type.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗Project monitor log form with client, contractor, and project details for full containment abatement.
NYC-WTC_000247616–000247617OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
(Wc 1. Client: kSSOCIATtS INC PROJECT MONITOR LOG Part 1
t>E' P efeeV- - Ml. feWfc- 5. Work Area(s):
dor SfCOOjl . Arc<\v\cl 6. Contractor C. 4 /'O'Aa 7. Contractor's Foreman: 8. ATC Representative: 9. Date: (T - i— e vNzvfx 2 9 Zo . z
Type of Project: Full-Containment Tent-Containment Glovebagging Other
Size of Project: Large (> 160 sq. ft., 260 lin. ft. of ACM) _____ Small (< 160 sq. fl., 260 lin, ft.)
Phase of Abatement: Pre-abatement Sampling Prep Aemoval Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 ■ 10) N/A (If already completed)
1 Construction of Decon: ___ Yes No 2. Ceiling Poly: Yes No 3. Critical Barriers (CBs): ___ Yes No 4. Wall Poly: Yes No 5. Removal to establish CBs: ___ Yes No 6. Floor Poly: Yes No 7. Negative air: ___ Yes No 8. Pre-cleaning: Yes No 9. Prep work completed: ___ Yes No 10. Temporary Power: Yes No 11. Other_______________ ___ Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: ___ Yes (Complete 1 - 5) N/A
1 Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other:
2. Negative air pressure > 0.02 in. of water: Yes No 3. Amended water used during removal: Yes No 4. Critical barriers intact for shift’s duration: Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1. 1 st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning: 3. Removal of 1 st poly layer after 1 st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No 5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1 /12-hour waiting period after 3rd cleaning: Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1 Construction of Tent: Yes No 2. Pre-cleaning: Yes No 3. Construction of Decon: Yes No 4. Negative Air; Yes No N/A 5. Prep work completed: Yes No 6. Pref-inspection passes: Yes No
Removal: 1 Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other: 2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
(If Glovebag Removal Check 3 through 8) 3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No 5. Amended water used: Yes No 6. Removal included cleaning and encapsulation: Yes No 7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No
Continued on Back Form NY-R 1/01
CONFIDENTIAL, CITY_21MC100_003446190 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000247616
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000247554
Project monitor log page for full-containment asbestos abatement, listing project staff and project type.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247594
Full-containment abatment monitor log—client, contractor, and location fields.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247644
Project monitor log with client, contractor, and project details for abatement.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247548
Monitor log for large abatement project at Broadway site, date field present.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247714
Project monitor log; encap/abate prep and contractor details.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247742
Full-containment abatement monitor log with location and prep notes.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247668
Project monitor log form for full containment abatement with project details.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247584
Monitor log page recording project type, location, and abatement phase.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177434
Form recording details for a large-scale full-containment asbestos abatement project including contractor and location data.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247676
Log for full-containment abatement project, includes location and prep details.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247688
Full-containment abatement monitor log with location and prep status.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247662
Project monitor log detailing client, contractor, and phase of abatement.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000177466
Application form for a permit covering the pre-abatement or removal phase of an asbestos abatement project.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247774
Containment abatement monitor log including client, contractor, and date.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247554
Project monitor log page for full-containment asbestos abatement, listing project staff and project type.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247668
Project monitor log form for full containment abatement with project details.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000129388
Collection of chain of custody forms for asbestos samples stored in DEP Box 19.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247694
Full-containment abatement monitor log showing project type and prep steps.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000247554
Project monitor log page for full-containment asbestos abatement, listing project staff and project type.
Similar indexed content
NYC-WTC_000247594
Full-containment abatment monitor log—client, contractor, and location fields.
Similar indexed content
NYC-WTC_000247644
Project monitor log with client, contractor, and project details for abatement.
Similar indexed content
NYC-WTC_000247548
Monitor log for large abatement project at Broadway site, date field present.
Similar indexed content
NYC-WTC_000247714
Project monitor log; encap/abate prep and contractor details.
Similar indexed content