NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 71 pages

Final report, Warren & Panzer Engineers, 2004

Machine-extracted title · confidence 41%

Final report for project N/A, prepared by Warren & Panzer Engineers; confidential info.

NYC-WTC_000247380–000247450
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Warren & Panzer Engineers, P.C. City of New York - Department of Design and Construction Peck Slip, Manhattan

c 2.5 Summary of Previous Environmental Investigations Warren & Panzer was supplied with a Corridor Assessment Report entitled “Corridor Assessment Report For Peck Slip, Borough of Manhattan, New York” dated June 29***, 2004, prepared by ATC Associates, Inc. This assessment had identified twenty-eight (28) sites categorized as initially having a “high” risk and eleven (11) sites categorized as initially having a “moderate” risk with respect to potential impact on the project. Based on modifying information, ATC recommends that twenty-one (21) of the initial “High” risk sites be reduced to “Moderate” risk sites, that three (3) of the initial “High” risk sites be reduced to “Low” risk sites, and that ten (10) of the initial “Moderate” risk sites be reduced to “Low” risk sites. The twenty-two (22) “Moderate” risk sites are recommended for monitoring during any excavation within 50 feet of the site. The four (4) “High” risk sites are recommended for further investigation by advancing soil borings in the vicinity of the site in question to evaluate soil and groundwater conditions for evidence of contamination.

3.0 SITE EVALUATION c 3.1 Soil and Groundwater Quality Investigation Proposed construction activities at this site will include soil excavation, which in-tum, will require that soils at the site be characterized to identify material handling requirements (i.e. use of protective equipment) and for material reuse, handling and/or waste disposal requirements. De-watering of excavations may also become necessary during the construction phase, which in- tum will require that wastewater also be characterized to identify handling and disposal requirements.

Warren & Panzer provided oversight for the advancement of three (3) soil borings and the installation of one temporary well point at designated areas in the vicinity of the planned reconstruction. The borings that were advanced were designated ENV-1, ENV-2 and ENV-3. The water sample was collected from ENV-2. ENV-4 was abandoned after utility clearance due to an old building foundation located beneath grade. ENV-5 was also abandoned prior to utility clearance because the utility maps show that a 24-inch 400-psi gas main lies beneath the

Warren & Panzer Project ID No. 1208.43.01 FINAL- September 30, 2004 DDC CAPIS ID No. HWM1159/HWMWTCA7D Work Order Letter No. 1355-W&P2R-1455

... I... -

CONFIDENTIAL INSURANCE INFORMATION, CITY_2IMCl00_008634565 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000247390

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000247390Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Semivolatile PAH testing, 2002

NYC-WTC_000337971

Laboratory report listing PAH compounds and concentrations from WTC site samples.

Similar indexed content

Compare copies and versions →