Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
T
84"' Precinct Work Order Letter No. 107-WPl
Warren & Panzer Engineers, P.C. September, 1998
2.0 REPORT CERTIFICATION
The field observations and research presented in this report have been promulgated in accordance
with generally accepted standards and practices performed when conducting project monitoring. This
report is limited with respect to information available at the time of preparation. Warren & Panzer
Engineers, P.C., certifies that, to the best of our knowledge, the information presented is reliable
with regard to apparent indications of existing or potential environmental conditions observed at the
time of the site visit.
Pete Marzec /
Project Manager
Page 4
CITY_21MC1OO_OO2833194
NYC-WTC_000387936
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000387936Source: NYC Law Department, mirrored locally