NYC-WTC_000359433
Airtek fee proposal with job details for Greenwich Street site under DDC.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗Supplemental fee proposal for CAPIS project related to Airtek submission.
NYC-WTC_000247078
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
i«
Airtek ENVrRONMENTAL AIRTEK ENVIRONMENTAL CORP. 39 WEST 38TH STREET, 12TH FLOOR, NEW YORK, NY 10018 PHONE (212) 768-0516 FAX (212) 768-0759 WWW.A1RTEKENV.COM
SUPPLEMENTAL FEE PROPOSAL 11/8/02 Professional Service Contract CAPIS ID PW335ES10 Contract Registration NO.: 20010015476 Maximum Fee: $1,000,000.00 Registration Date: 12/26/2Wilil _____________ F'- 1 NYC DDC Project Number: HWMWTCA1A Project Name: Greenwich Street / Rector & Washington Fee Proposal Number: 02-1059 Address: Manhattan, NY
HOURS Technical Support/Labor Sr. Project Manager Project Manager Env. Technician Total TASK Rate: $93.10 Rate: $63.70 Rate: $44.10 Initial Project Scoping/Work Plan Field Activities: Asbestos Air Monitoring Preparation & Submission of Draft & Final Report (3 Draft, 5 Final) QA/QC Total Technical/Labor Cost $
Sampling & Analysis Costs Unit Quantity Rate Total PCM Analysis Air Sample -1 day TAT Sample 11 $12.00 $132.00 Total Sampling & Analysis Cost $ 132.00
|total supplemental fee proposal cost n 132 00 I
Signed by: -bh — on behalf of Airtek Environmental Corp. Christine Chen, Senior Project Manager
Signed by: on behalf of DDC EHSS
File Name; Share on 'Airteksvr1'(S:)\UUC uocuments\U2-ua^jhee Hroposai^_^^^ CONSULTANTS
CONFIDENTIAL, CITY_21MC100_009890009 SUBJECT TO PROTECTIVE ORDER NO.3, JULY 2009
NYC-WTC_000247078
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000359433
Airtek fee proposal with job details for Greenwich Street site under DDC.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247077
Airtek Environmental fee proposal for CAPIS project with NYC DDC reference.
3 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359432
Fee proposal from Airtek for Greenwich Street project work under DDC contract.
1 shared non-person entities · 1 shared topics · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290925
Fee proposal from ATC Associates for environmental services at World Trade Center Emergency site.
1 shared non-person entities · 1 shared topics · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000387897
FEE PROPOSAL detailing labor and sample/analysis costs for boiler monitoring.
2 shared non-person entities · 1 shared topics · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000220185
Fee proposal document for boiler and air monitoring services at a Bronx location dated December 1998.
2 shared non-person entities · 1 shared topics · similarity 0.895
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000387900
Detailed labor and sample costs for boiler monitoring project proposal.
2 shared non-person entities · 1 shared topics · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000387903
Labor and analysis costs for boiler monitoring project, dated 11/21/98.
2 shared non-person entities · 1 shared topics · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280684
Fee proposal outlining environmental sampling/scopes and shifts for the WTC Emergency project.
1 shared non-person entities · 1 shared topics · similarity 0.887
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359424
Final report of air monitoring services for Greenwich Street abatement project.
3 shared non-person entities · similarity 0.887
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177412
Final report from Airtek Environmental Corp detailing air monitoring services performed at 108 Greenwich Street.
2 shared non-person entities · similarity 0.886
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356459
Memo regarding asbestos survey and environmental consulting services for proposed project.
1 shared non-person entities · similarity 0.890
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000359433
Airtek fee proposal with job details for Greenwich Street site under DDC.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247077
Airtek Environmental fee proposal for CAPIS project with NYC DDC reference.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359432
Fee proposal from Airtek for Greenwich Street project work under DDC contract.
Similarity score 0.968 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000387897
FEE PROPOSAL detailing labor and sample/analysis costs for boiler monitoring.
Similarity score 0.949 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000220185
Fee proposal document for boiler and air monitoring services at a Bronx location dated December 1998.
Similarity score 0.948 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000387900
Detailed labor and sample costs for boiler monitoring project proposal.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000359433
Airtek fee proposal with job details for Greenwich Street site under DDC.
Similar indexed content
NYC-WTC_000247077
Airtek Environmental fee proposal for CAPIS project with NYC DDC reference.
Similar indexed content
NYC-WTC_000359432
Fee proposal from Airtek for Greenwich Street project work under DDC contract.
Similar indexed content
NYC-WTC_000290925
Fee proposal from ATC Associates for environmental services at World Trade Center Emergency site.
Similar indexed content
FEE PROPOSAL detailing labor and sample/analysis costs for boiler monitoring.
Similar indexed content