Summary of Stuyvesant HS SCA work, Aug 2002

Machine-extracted title · confidence 66%

Summary of work performed at Stuyvesant High School by SCA consultants and Kiss.

NYC-WTC_000245913–000245916
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TDX as a CM for the SCA retained the services of V&R Mechanical; to perform the mechanical and duct cleaning work on the HVAC system. V&R is an SCA approved, licensed and bonded mechanical contractor who has worked in two other schools in the vicinity of ground zero.

V&R Mechanical retained Better Air Quality (BAQ), an SCA approved contractor who is licensed and certified by the National Air Duct Cleaning Association (NADCA). BAQ was retained to perform cleaning of the air conveyance system throughout the high school.

TDX also retained the services of CTE Cleantech, an SCA approved and licensed contractor specializing in post occupancy clean up and post 9/11 clean up at ground zero office buildings. CTE was retained to perform dust removal throughout the high school, primarily in all corridors from the 1st to the 10th floor.

Activities performed by TDX’s subcontractors are outlined as FOLLOWS:

Means and method for cleaning the HVAC systems was as follows:

1) Phase A: Disconnection of horizontal and removal vertical unit ventilators by Mechanical Contractor for cleaning by the Environmental Contractor.

The removal work included, but is not limited to the following:

a) Isolation of unit ventilator from the hoL'chilled water distribution system b) Drainage of the unit ventilator hot/chilled water coil - 30% Ethylene Glycol solution. c) Disposal of the 30% Ethylene Glycol solution by approved EPA standards. d) Safe off electrical power to the unit ventilators from the electrical distribution panel and discomiect electrical supply. e) Disconnect unit ventilators hot water and chilled water connections and swing out vertical units a minimum of 4.5 degrees to provide access for cleaning. f) Disconnect ceiling mounted ducted unit ventilators hot water and chilled water connections and lower units to floor level to provide access for cleaning. g) Remove existing 2” charcoal filters and HEPA vacuum per SCA cleaning protocols. h) Steam clean with low water volume system the following: => Heat/Cooling Coil => Supply fan blades and diffuser dry all surfaces including HEPA vacuum, wipe clean and dry, per SCA cleaning protocol, all ceiling mounted supply and return grilles associated with the classroom unit ventilators surfaces

This work includes but is not limited to the following: > Removal of supply air diffusers/return air grilles to obtain access to balancing dampers, splitter dampers, and ductwork. > Manually remove any debris accumulation behind diffusers/return grilles that cannot be removed by HEPA vacuuming. > HEPA vacuum, wipe clean and dry all HVAC supply components and ductwork 12 inches above and below each supply air diffuser or return air grille.

CITY_21MC100_013380898

NYC-WTC_000245915

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245915Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000418887

Summary of environmental work at Stuyvesant High School; contractors and scope.

Similar indexed content

NYC-WTC_000418892

Summary of environmental work at Stuyvesant High School; contractors and scope.

Similar indexed content

NYC-WTC_000246075

Summary of environmental cleaning and testing at Stuyvesant High School.

Similar indexed content

Compare copies and versions →