NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 427 pages

Permit application, Education Dept.

Machine-extracted title · confidence 15%

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

NYC-WTC_000245464–000245890
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

De pa R T M E NT 0 F INFORMAT I ON T E C H N O L O G Y AN D T E LE G O M M U NIC AT I O N S • DoITT initiated a Web-enabled system, the Electronic Strategic Plan (eSP) system, to assist the Technology Steering Committee in its mandate to review and approve agency technology project plans on an annual basis. This tool will enable TSC to more effectively manage IT projects on a citywide enterprisewide level; to reach more informed IT budget and resource allocation decisions; and to achieve economies of scale by consolidating IT project data from all agencies into one database, regardless of funding source. In January 2002 all mayoral agencies were required to submit their Fiscal 2003 annual agency technology project plans through this system.

Technology Infrastructure • In October 2001 DoITT completed the upgrade of ail three MetroTech mainframe processors. The upgrade doubles the processing power and memory, and adds 50 percent more online disk storage. In addition, the speed of the network connections from the mainframe to the Internet/intranet were enhanced sixfold. The machines now process more than 2 billion instructions per second, have 38 gigabytes of random access memory (RAM). 10 gigabytes of disk storage, and move Internet/intranet data at a rate of 1 gigabyte per second. The upgrades have provided the capacity needed to develop new e-government applications, including the City’s Electronic Citizen Service Request Management (eCRM) system and the Department of Finance’s (DOF) Borough, Block, and Lot application, which enables users to obtain block and lot information upon entering a street address.

• During the first four months of Fiscal 2002 the mainframe operating systems that provide the environment to run both mission critical computer-based systems for City agencies and Web­ publishing software were upgraded. Major performance enhancements were realized, allowing faster processing time and reduced transaction response times. In addition, the Web-enabling software is now significantly more robust and efficient. The citywide intranet (CityShare) and three e-government Internet applications are running on the new MetroTech mainframe processors, two others are in development, and many more are planned. DoITT now has the capacity and the operating environment to consolidate other platforms onto the City’s mainframes and realize true economies of scale, in terms of backup/recovery, disaster recovery, reduction in operational and technical support costs and reduced maintenance costs.

• The Department’s planned upgrade of the City’s Internet telecommunications infrastructure, which had been proceeding on schedule, has been delayed due to the events of September 11, 2001. DoITT expects to complete this project in the first quarter of Calendar 2002. This initiative includes three projects. The Virtual Private Network (VPN) will bring additional services to City agencies by providing a secure method for remote users to access the City’s databases and other information systems over the Internet. The File Transfer Program (FTP) will allow business partners such as banks, contractors and vendors to exchange large data files with City agencies via the Internet. The third project, upgrading the City’s Internet infrastructure, will more than double the City’s capacity to add application servers to the Internet, enabling the expected growth of e-government services.

Collectively, these projects will increase data carrying capacity, from the current 100 megabits (100 million bits) per second to a gigabit (1 billion bits) per second. The infrastructure upgrades include automatic recovery and redundancy features to reduce the effect of connection failures, significantly improving the availability of internet applications.

An additional benefit of the Internet infrastructure upgrade will be to enable DoITT to provide City employees with limited Internet access through the intranet to sites specifically designated by management. Currently, City employees are not approved for Internet access, and.are unable to reach any externally hosted Web sites through the intranet, such as health insurance providers’ Web sites, even though these are related to employee benefits or information.

442

I CITY_21MC100_013395489

NYC-WTC_000245876

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245876Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →