NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 427 pages

Permit application, Education Dept.

Machine-extracted title · confidence 15%

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

NYC-WTC_000245464–000245890
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Department OF D e s I g n and Co n st r ucti o n The design on a combined EMS/Fire Station on Rossville Avenue in Staten Island began in November 2000, and was completed in June 2001. Construction began in February 2002 and is scheduled for completion in February 2003.

During Fiscal 2001 DDC began design for major additions to the recently completed Horizon and Crossroads Juvenile Justice centers in Brooklyn and the Bronx, respectively. The current estimate for construction of the two additions, adding 100 beds to each facility, is a total of $110 million. Pending funding authorization, both design completion and construction start are scheduled for Fiscal 2003.

During Fiscal 2001 the Queens Criminal Court Phase II addition was on hold while two expansion options were assessed. The first option was within the permissible zoning and required no special approvals; the second option was more extensive and required a Uniform Land Use Review Procedure (ULURP). In May 2001 a decision was made to proceed with the first option that fit within the existing zoning envelope. This option will add 24 new court parts at a construction cost of approximately $150 million, including renovation work on the existing building. Schematic design has recommenced; design completion and construction start are scheduled for Fiscal 2003 pending funding authorization.

in May 2001 design began for the Department of Correction’s (DOC) $75 million Capacity Replacement Program in which temporary housing on Rikers Island will be replaced by permanent facilities. The program includes construction of a 200-bed facility at the Adolescent Reception and Detention Center and an 800-bed facility at the Rose M. Singer Center for Women. Design completion is scheduled for early Fiscal 2003. Due to the facilities’ proximity to La Guardia Airport, Federal Aviation Administration approval of the design of the structures is required before construction can begin.

• During the first four months of Fiscal 2002 DDC started 14 new public safety construction projects citywide, compared to 31 projects during the same period in Fiscal 2001.

• The Department is implementing a court-ordered fire/life safety program, valued at $190 million, for DOC. The program includes upgrades to fire alarm and sprinkler systems, additional means of egress, fire-rated partitions, smoke management/purge systems and smoke detection systems.

Projects at the Adolescent Reception and Detention Center, Anna M. Kross Center, Eric M. Taylor Center, George Motchen Detention Center and James A. Thomas Center, all on Rikers Island, as well as the Bronx Detention Complex, are currently under construction and scheduled for completion by December 2002.

In addition, an $8.3 million project at the Brooklyn House of Detention, adding two exterior stair towers, was completed in March 2001, three months ahead of the court mandated date. In April 2001 a $15 million project began at the same facility to install fire alarm, smoke detection and sprinkler upgrades. Completion is scheduled for December 2002.

• In February 2001 DDC began work on upgrades to the Fire Department of the City of New York’s j (FDNY) Training Academy on Randall’s Island in Manhattan. Phase I of the project, including site preparation, street widening and the installation of underground utilities, was completed in July | 2001. Phase 11, including the renovation of a smoke training building and the construction of a new classroom building, a field house and fire training building, began in July 2001; completion is scheduled for February 2003. j

• During the first four months of Fiscal 2002 the Structures Division completed six public safety construction projects, compared to 31 projects during the same period in Fiscal 2001.

146

CITY_21MC100_013395218

NYC-WTC_000245605

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245605Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →