Daily work force report, World Trade site, Feb 2002

Machine-extracted title · confidence 28%

Daily workforce and equipment at World Trade site for Feb 21, 2002.

NYC-WTC_000243997
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 BIh Raad. Whitestone. N.Y. 11357-(718) 767-9000 DATE: 2/21/02 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Local on: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDEN" ■ CAT 966 LOADER 1* FOREMEN 3 ■ CAT 365 GFIAPPLER PROJECT ENGINEER 1 ■ CAT 375 GRAPPLER SAFETY ENGINEER ■ CAT 375 BUCKET 1 LABORERS 16 ■ HITACHI 750 GRAPPLER 1 IRON WORKERS ■ HITACHI 1200 GFtAPPLER 1 LOCAL 14 2 ■ 185 CFM COMPRESSOR RUNNING UNMANNED LOCAL 15 3 ■ 235 HAMMER HOE RAM 1 CARPENTER ■ MECHANICS TRUCK 1 1 CARPENTER FOREMAN 'TOOL TRUCK TEAMSTERS (FUEL) 1 ■ TOOL VAN MECHANICS 2 ■ ROLL OFF HOUSE WRECKERS ' DUMP TRAILERS ' LOW BED TRAII FR ■ HIGH DECK TFtAILERS ■ WELDING TRUCK DELIVERIES:__________________________________ ■ FUEL TRUCK 1 TULLY BORROWED 966 LOADER AT 5:20 AM-7:00AM ■ PICKUP TRUCKS 3 TULLY OPERATOF:_____________________________ ■ LIGHT TOWERS 5 BILL ACCORDINGLY AS PER MIKE MOONAN ■ SITE MULE 2 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ■ OFFICE TFLAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2

Description of Work:_________________________________________________ FINAL WORK:_____________________________________________________ CONTINUE REMOMNG DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE TRUCKS DELAYEC FROM 12:00-1:00 DUE TO WASH STATION SHUT DOWN FOR CLEANING OF- GRATES.________________________________________ TRUCKS DELAYEL> FROM 2:00-2:15 DUE TO TULLY BACK FILLING TRENCH ON HAUL ROUTE OUTSIDE WASH STATION___________________________ LOADS OUT: 74 GRACE CONTRACTING CORP | Approved By: BY; Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0221N.xls

CONFIDENTIAL, CITY_21MC1OO_OO6OO2878 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000243997

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243997Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →