NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Frank Wyskiel page 2

management for the $700 million Alba Potline 4 aluminum smelter project. The project was completed on budget and schedule despite the disruption of the Gulf War.

1987 -1989 Bechtel National, San Francisco, California. Vice President of Bechtel Construction, Inc. and Bechtel Constructors Corporation. Mr. Wyskiel directed the construction program for new corporate ventures involving high technology, research and development, U.S. government defense and space programs, and environment and nuclear waste handling. In this capacity, he directed construction operations for projects including new technologies for electrical power generation; computer integrated manufacturing including five sites for Nabisco Brands; construction management of an advanced lithographic facility for IBM microelectronics; disposal of hazardous waste from a BF Goodrich pond closure; revamping space launch facilities at Cape Canaveral/Kennedy Space Center; and the security system installation Johnston Island in Pacific Ocean.

1979 -1989 Overseas Bechtel, Inc., London Division BPI, London, England. Director of Operations and Manager of Construction. All work operations in the U.K., Europe, Africa, Middle East and Asia were under his purview. He had direct responsibility for all projects, including engineering, procurement and construction services, and had 16 project managers reporting directly to him. Major projects included petrochemical and gas installations requiring camps for up to 5,000 workers in remote desert environments.

Mr. Wyskiel was responsible for projects which at peak had 32,000 persons worldwide under his purview. He held responsibility for contract administration, project planning and logistics support, project controls for cost and schedules, safety programs and performance, craft training, quality assurance and control, engineering and construction management, and commissioning programs for plant startups. Major projects included an alumina plant, various refinery, chemical, gas, petrochemical, and pipeline projects, civil infrastructure projects including airports, and industrial facilities. These included major operations in Indonesia at Balikpapan, Bontang and Arun which involved a work force of approximately 20,000 of which 15,000 were direct hire. An extensive training program was developed. One of the keys to the success of the projects was the overall logistics program which involved the installation of local facilities to receive, store and handle material and equipment.

Prior Experience Mr. Wyskiel began his career with Bechtel in 1960 as an assistant field engineer on refinery and chemical plant construction.

BDResuinc{]/98) (Buildings update)

CITY_21 MCI 00_014587541

NYC-WTC_000243417

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243417Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →