NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Frank A. Wyskiel Project Director

Summary Mr. Wyskiel is one of the leading figures in Bechtel’s recent construction history. In his more than 35 years of project and construction management, and field engineering experience, he has handled major division responsibilities as well as project responsibilities with the highest degree of success, at one point with 32,000 people under his purview on construction projects worldwide. Over 22 years were spent in supervision of diverse, complex projects and operations in the U.S.A., Canada, Europe, Asia, and the Middle East. These projects involved planning in difficult terrain and environments, coordinating multi-national work forces and subcontractors, complex logistics and extensive support facilities, environmental planning for hazards control, and implementation of site safety and security programs.

Education BCE, Civil Engineering, Cornell University, 1960

Professional Data Department of Defense Top Secret Clearance (inactive)

Relevant Experience

5/2001 - 8/2001 Rancocas Bridge Recovery, New Jersey. Project Manager. Following the capsizing of a 1,000-ton steel arch bridge to be placed over Rancocas Creek in New Jersey, along with its 300-ton barge, Mr. Wyskiel was called in to manage the salvage of the bridge and barge. Once a plan was developed, the bridge was recovered and repaired, and 3 days later, Mr. Wyskiel oversaw setting the bridge in its intended location.

2000-2001 Epcon Utilities Expansion Project, Yanbu, Saudi Arabia. Project Director. Mr. Wyskiel led a Bechtel joint venture for the development of a $1 billion utilities expansion for the Royal Commission of Yanbu.

1996 -1999 Bechtel Water Technology, Ltd. (BWT), Warrington, England. Managing Director. Mr. Wyskiel had overall management responsibilities for BWT, which was formed in 1995 with the acquisition of the 1000- person strong North West Water Engineering, Ltd., in the United Kingdom. He oversaw management of more than 700 ongoing municipal and industrial water and wastewater projects, worldwide.

1992 -1995 Bechtel Mining and Metals, The Hague, Netherlands. Vice President Operations. Mr. Wyskiel oversaw all Bechtel mining and metals operations including projects in Saudi Arabia and Venezuela.

1989 -1992 Alba Aluminum Smelter Project, Bahrain. Project Manager. Mr. Wyskiel had responsibility for engineering, procurement and construction BD Resume (1/98) (Buildings update)

CITY_21 MCI 00_014587540

NYC-WTC_000243416

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243416Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →