NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Alexander J. Wall Logistics

Summary Mr. Wall is a civil field engineer, with experience in building and plant construction. He brings to this project demonstrated experience in logistics, tracking quantities and materials, tracking subcontractors, and performing inspections. He has worked on industrial buildings, office buildings, and medical facilities, and is experienced in working with specialty subcontractors in coordinating concurrent construction activities. He has experience managing site logistics including work access, staging areas and materials control.

Education B.S., Civil Engineering, The University of Texas at Austin, 1999

Professional Data Engineer in Training Certificate

Relevant Experience

2000 - Present Exxon Baytown Coker Project, Baytown, Texas. Civil Field Engineer. Mr. Wall tracked quantities and materials for civil construction, and tracked the drilled pier subcontractor. He also assisted with constructibility issues and civil field design, and worked on generation of cost trends and total installed cost savings. He performed takeoffs of work to be performed, performed pre-pour and drilled pier inspections, and worked on the Six Sigma Concrete Process Improvement Project (PIP).

Previously on this project, Mr. Wall worked as piping field engineer, and chaired system turnover teams and tracked piping insulation and steam tracing subcontractors. He inspected hydrotest packages and verified installed quantities.

1999 Allergan Pharmaceutical Plant (Turner Construction Company), Waco, Texas. Assistant Superintendent. Mr. Wall tracked subcontractors, scheduled work, and assisted with constructibility issues. He also corresponded with the owner representative, developed RFFs and COI’s, wrote daily construction reports, and conducted weekly safety reviews of the jobsite.

1998 -1999 Brown Building (Einbeck Construction Company), Austin, Texas. Project/Field Engineer Assistant. Mr. Wall assisted with closeout procedures and punchlist, ordering and tabulating of materials, and correspondence with subcontractors.

1997-1998 Enercon Engineering Company, Houston, Texas. Structural Engineer Assistant. Mr. Wall simulated load applications on decks of an offshore platform and calculated center of gravity of decks.

01090

CITY_21 MCI 00_014587538

NYC-WTC_000243414

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243414Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →