DEPARTMENT OF DESIGN AND CONSTRUCTION
DIVISION OF INFRASTRUCTURE
CONSTRUCTION STATUS REPORT - ACTIVE PROJECTS
Construction Managing Boro: Bronx
Contractor Bid Amount Bld Date OrigCompI % Time Eiap Orig SawerCompI Const Deputy Dir Field Office Location
Project ID Description Business Tel Current Amt Award Dats Current CCD ; % Time Current Art17Compl Const EIC
Cont Reg No. Borough Fax Vouchered Amt Reg Date Current Compl % Time Projected i SubstCompI : Project Manager Field Office TeUFax
REI Reg No. Project Phase 24hr Contact Est Final Cost OTWDate Projected CCD % Const CompI ; Final Compl { Resident Engineer Contractor Supervisor
24hrTel OriginaICCD i ProjCompI : Delay Ftefl ।, REIHrm Supervisors Held TeU24hr Tel
SEX20039 STORM SEWER IN FAIRFAX , CAC Industries, Inc. $2;t45333.50 03/10/2010'06/1272012 29% 3425 E. Tremont, Suite # 7,2nd Floor
20101421233 AVENUE ■ (718)729-3600 Bid 04/27/2010 Abdulrazzak, Fares i Bronx, NY.
20117204471 ; (718)729-0400 Cur 07/14/2010 Rawal, Aniruddh 1 (718)892-6412 f718)892-«7t)9
Bronx
: William Svilar $2445333.50 Bid 02/14/2011 20% George Mercelin : EDRuckel
Construction 0-25% i (347)728-6363 485 i ' Gandhi Engineering, Inc. i (347)234-3065 (347)728-0220
SEX20041 SAN SEWERS IN VALHALLA DRIVE : Maspeth Supply Ca LLC. $868,407.00 01/2672011 I I I
1
20111444987 ! (718)786-7000 $868,407.00 100% Bid 04/18/2011 !
Bronx ’ (718)937-5164
Harvey Blatt
$0.00
$868,407.00
0% Cur
100% Bid
06/01/2011 >
I
' Patel, Ktrtan I
’ Harvey Lyons
Construction 0-25% I (516)367-1068 210 (516)829-5197
Total Number of Projects In Bronx: 21
Tota Amount In Bronx: $151,838,192,M
07/05/2011 Notes: (1) CCD includes 10 days tor mobifization for alt projects. (2) The dock tor %lime elapsed stops at substantial complelton. (3) Delay is flagged if"% Const CompT Is more than 20 points bekMr"% Time Elap Orig". Page4or 17