NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

David Field Construction Coordination

Summary Mr. Field has over 30 years of experience as a construction manager and inspector for heavy civil projects. He is expert in the demolition and destruction of buildings, including structures that housed contaminated equipment, as well as final disposition of building materials in an environmentally responsible manner. Mr. Field is a career-long construction professional, skilled in construction management and subcontract management, as well as management of large, diverse workforces in multiple locations. Mr. Field is experienced in the implementation and enforcement of site safety and security programs associated with complex construction.

Education B.S., Mining, Colorado School of Mines, 1971 Certificates, OSHA HAZWOPR and site supervision courses, 1993

Relevant Experience

1999-Present AFCAP Project Shining Hope, Albania. Site Manager. Mr. Field has served as a site manager overseeing construction of refugee camp facilities.

1996 -1999 Ukraine ICBM Silo Project, Kiev, Ukraine. Supervising Construction Engineer. Mr. Field was responsible for directing the demolition of missile silos and buildings. His duties included planning for drilling and blasting, demolition and destruction of buildings that housed contaminated equipment, and final disposition of buildings.

1994-1996 Pease Air Force Base, Portsmouth, New Hampshire. Senior Construction Engineer. Mr. Field was responsible for overseeing environmental remediation work including restored wetlands, RECRA cover over sanitary landfill, and clean-up of soil and contaminated hydrocarbons.

1993 -1994 Stringfellow Project, Riverside, California. Site Construction Manager. Mr. Field was responsible for subcontract management of three environmental projects, which included drill and shoot french drain trenches, rip rap and shotcrete channels, diamond drilling, well and piping installation and drill and shoot excavation of a 90-foot shaft and installation of related mechanical and electrical systems.

1991-1992 Newmont Refractory Ore Treatment Plant, Carlin, Nevada. Earth dam inspector and technical advisor. Mr. Field was responsible for monitoring the construction of an earth and rock fill tailings dam.

01090

CITY_21 MCI 00 014587525

NYC-WTC_000243401

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243401Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →