Daily work force report, World Trade Center, Feb 2, 2002

Machine-extracted title · confidence 95%

Day shift preliminary daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.

NYC-WTC_000237689
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.46 6th Road, Whitestone, N.V. 11357.(718)767.9000 DATE: 2/2/02 DAY PRELIMINARY

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions: COOL AND RAINY

Labor I Equipmertt CLASSIFICATION QUANT, I Description MANNED STANDBY IDLE superintendent 2 CAT 96S LOADER 1 PROJECT ENGINEER 1 CAT 365 GRAPPLER 1 OFFICE ENGINEER CAT 375 GRAPPLER 2 FOREMEN 1 HITACHI 750 GRAPPLER 1 SAFETY OFFICER 1 HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR 1 IRON WORKERS 235 HAMMER HOE RAM 1 LOCAL 14 4 MECHANICS TRUCK 2 LOCAL 15 5 TOOL TRUCK 1 CARPENTER 1 TOOL VAN CARPENTER FOREMAN 1 ROLL OFF TEAMSTERS (FUEL, TRAILER DELIVERY) 1 DUMP TRAILERS 8 TEAMSTERS {FLATBEDS, DUMPS, AND EUKES) 14 LOW BED TRAILER MECHANICS 2 HIGH DECK TRAILERS 3 HOUSE WRECKERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 5 DELIVERIES: SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2

LIGHT TOWERS USED FOR 2.5 HOURS

Description of Work:_________________________________________________ _______________________ ANriCIPArED WORK_______________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA__________________________________________ 'record times and numbers of truck loads OF DEBRIS FROM SITE LOADS OUT:_______________________________________________________________________________ YUKES:___________________________________________________________________________________ DOT LOADS:

GRACE CONTRACTING CORP Approved By: BY; Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0201D.xls

CONF I DEKTIF'ZF, 2IMC1 0 0_0 03416063 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000237689

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000237689Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →