Daily workforce and equipment summary for World Trade Center project on 1/30/02.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗Day shift daily work force and equipment log for Grace Contracting Corp. at the World Trade site.
NYC-WTC_000237681
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-»5Gth Road, Whitestone, N.Y. 11357-(716) 767-9000 DATE: 1/29/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT, Description [MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 365 GRAPPLER 1 OFFICE ENGINEER 1 CAT 375 GRAPPLER 2 FOREMEN 1 HITACHI 750 GRAPPLER 1 SAFETY OFFICER 1 HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR 1 IRON WORKERS 235 HAMMER HOE RAM 1 LOCAL 14 4 MECHANICS TRUCK 2 LOCAL 15 5 TOOL TRUCK CARPENTER TOOL VAN 1 CARPENTER FOREMAN______________________ ROLL OFF TEAMSTERS (FUEL, TRAILER DELIVERY} 2 DUMP TRAILERS TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 15 LOW BED TRAILER MECHANICS 2 HIGH DECK TRAILERS HOUSE WRECKERS 1 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 5 DELIVERIES: AWISCO SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2
LIGHT TOWERS USED FOR 2.5 HOURS
Description of Work:
CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA______________________ RECORD TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE LOADS OUT 111 YUKES 182 DOT LOADS 104
GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0129D.xls
CONF I DENTIEIIY,_2 IMC1 0 0_0 03416055
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000237681
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000263647
Daily workforce and equipment summary for World Trade Center project on 1/30/02.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342323
Day shift daily workforce and equipment at World Trade site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237682
Night shift daily work force and equipment log for Grace Contracting Corp. at the World Trade site.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429415
Day shift staffing and equipment details for World Trade Center project on 1/29/02.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237694
Night shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305185
Day final workforce and equipment for World Trade, Jan 30, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263587
Daily workforce and equipment listing for World Trade Center job site (Grace Contracting), Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237662
Grace Contracting Corp. daily log of laborers and equipment at the World Trade site for January 19, 2002 day shift.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342315
Day final staffing and equipment at World Trade site, Jan 26, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000244011
Night final daily workforce and equipment at World Trade site, Feb 28, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237699
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305136
Daily workforce and equipment at World Trade site, Feb 14, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000263647
Daily workforce and equipment summary for World Trade Center project on 1/30/02.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342323
Day shift daily workforce and equipment at World Trade site, January 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237682
Night shift daily work force and equipment log for Grace Contracting Corp. at the World Trade site.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429415
Day shift staffing and equipment details for World Trade Center project on 1/29/02.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237694
Night shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305185
Day final workforce and equipment for World Trade, Jan 30, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000263647
Daily workforce and equipment summary for World Trade Center project on 1/30/02.
Similar indexed content
NYC-WTC_000342323
Day shift daily workforce and equipment at World Trade site, January 2002.
Similar indexed content
NYC-WTC_000237682
Night shift daily work force and equipment log for Grace Contracting Corp. at the World Trade site.
Similar indexed content
NYC-WTC_000429415
Day shift staffing and equipment details for World Trade Center project on 1/29/02.
Similar indexed content
NYC-WTC_000237694
Night shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similar indexed content