Daily work force report, World Trade Site, Jan 13 2002

Machine-extracted title · confidence 95%

Grace Contracting Corp. daily log of laborers and equipment at the World Trade site for January 13, 2002 night shift.

NYC-WTC_000237651
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 15145 8th Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE: 01/13/02 NIGHT FINAL

DAILY WORK FORCE REPORT

pob Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE [SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT446 BACKHOE 1 IIOFFICE ENGINEER CAT 973 LOADER [foremen 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 22 CAT 375 BUCKET 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER LOCAL 15 9 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 15 [SITE MULE ~ 3 [ DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 RAINMAKER/GENIE LIFT 1

Description of Work: COMOPLETED WORK__________________________________________________________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT EXPOSING PATH TRAINS MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA MANNED WATERING STATIONS FOR DUST CONTROL LOADS OUT: EUKESOUT:

GRACE CONTRACTING CORP| Approved By: Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0113N.xls

CONFIDENTIAL, CITY_21MC100_003415925 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000237651

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000237651Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000237642

Night shift report from Grace Contracting listing workforce and equipment deployed at the World Trade Center on January 8, 2002.

Similar indexed content

Compare copies and versions →