GRACE CONTRACTING CORP. 161-45 6th Road, Whitestone, N.Y. 11357-(718] 767-9000 DATE: 1-10-02 NIGHT FINAL
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 BUCKET 1 LABORERS____________ 20 CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 4 HITACHI 550 BUCKET 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 2 TOOL VAN 3 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 15 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 RAINMAKER/GENIE LIFT 1
Description of Work:______________________________________________________________________________________ WORK COMPLETED____________________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT M;4JffrANm4FFICFLOy^______________________________________________________ MAN WATERING STATIONS FOR DUST CONTROL________________________________________________________ TRUCK 72 INVOLVED IN MINOR ACCIDENT WITH TAXI; TRUCK WAS REPAIRED AND RETURNED TO SERVICE LOADS OUT:___________________________________________________________________________________________ EUKES OUT:
GRACfiiCONTRACTING CORP Approved By: Title: For: {superintendent
DAILY WORK FORCE REPORT0110N.xls
CONFIDENTIAL, CITY_21MC100_003415919 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000237645
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000263608
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263615
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000235137
Day shift daily log of laborers and heavy equipment at the World Trade Center site on January 7, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263614
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237643
Day shift report from Grace Contracting documenting labor and equipment counts at the World Trade Center site on January 9, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388409
Saturday/Sunday continues; final daily workforce report for World Trade with equipment.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237641
Day shift report from Grace Contracting documenting labor and equipment counts at the World Trade Center site on January 8, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342291
Nightly daily workforce report for World Trade Center construction.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429383
Day shift roster and equipment details for World Trade site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269227
Day final daily workforce and equipment at World Trade, Jan 3, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341037
Night shift worker and equipment tally for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302509
Night final daily workforce report for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000263608
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263615
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000235137
Day shift daily log of laborers and heavy equipment at the World Trade Center site on January 7, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263614
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237643
Day shift report from Grace Contracting documenting labor and equipment counts at the World Trade Center site on January 9, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388409
Saturday/Sunday continues; final daily workforce report for World Trade with equipment.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000263608
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
Similar indexed content
NYC-WTC_000263615
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
Similar indexed content
NYC-WTC_000235137
Day shift daily log of laborers and heavy equipment at the World Trade Center site on January 7, 2002.
Similar indexed content
NYC-WTC_000263614
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
Similar indexed content
Day shift report from Grace Contracting documenting labor and equipment counts at the World Trade Center site on January 9, 2002.
Similar indexed content