NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Additional Work Authorization Form, World Trade Center Site

Machine-extracted title · confidence 90%

An administrative form authorizing additional work by Mazzocchi Wrecking for the World Trade Center project.

NYC-WTC_000237621
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

z ADDITIONAL WORK AUTHORIZATION MAZZOCCHI WRECKING 32 WILLIAMS PARKWAY P. O. BOX 331 EAST HANOVER, NJ 07936-( 11 PHONE: (973) 884-8682 FAX; (973) 377-7464 PHONE name”® Evergreen Recycling Of Corona (EROC) [718] 446-7000 STREET JOB NAME Hob NUMBER Willets Point Boulevard World Trade Center CITY STATE STREET Corona New York existing contract number DATE OF EXISTING CONTRACT CITY STATE New York City New York You are authorized to perform the following specifically described additional work: Cat 246 Skid Steer /A /Imgersoll Rand Air Compressor /lZ/4 Cat 966 Loader________ fil ler Mai nten^^^ / 1Hitachi 450 w/Grapple /a /WeldersMaintenance Trailers M/Z Hitachi 5M w/Grapple / Mechanics w/Service Trucks . 2^. OfHitachi750 w/Grapple / Clerical Personnel Hitachi 1200 w/Grapple UL Foreman i Mobile Power Washer I 2. Ja Burners 7a / 7 BollcPff Truckts) Service Trucks Han Basket / /a 4 Laborers Mechanics Oilers y _JZ. Ia Tractor Trailer(s) 50 CY Operators AVX Tractor Trailer(s) Low Bed i Working Supervisors 'Z 12, Kobelco 850 J Safety Supervisors v/ AM Truck Drivers

ADDITIONAL CHARGE FOR ABOVE WORK IS: $ Payment will be made as follows:

Above additional work to be performed under same conditi^s as specified ipLoriginal contnact unless otherwise stipulated.

Date Authorizing Signature / (OWNER SIGNS HERE) ______ ______________ .

We hereby agree to furnish labor and materials - complete in accordance with the above specifications, at above stated price.

. ..norized Signature Date {CONTRACTOR SIGNS HERE)

THIS IS CHANGE ORDER NO. NOTE; This Revision becomes pari of, and in conformance with, the existing contract. z CONFIDENTIAL, CITY_2IMCl0 0_0 0 2 013 0 8 0 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008 NYC-WTC_000237621

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000237621Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000237613

An administrative form authorizing additional work by Mazzocchi Wrecking for the World Trade Center project.

Similar indexed content

Compare copies and versions →