NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Additional Work Authorization Form, World Trade Center Site

Machine-extracted title · confidence 90%

An administrative form authorizing additional work by Mazzocchi Wrecking for the World Trade Center project.

NYC-WTC_000237616
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

\ ADDITIONAL WORK AUTHORIZATION MAZZOCCHI WRECKING 32 WILLIAMS PARKWAY 133/1 P. O. BOX 331 EAST HANOVER, NJ 07936-0331 PHONE: (973) 884-8682 OayShlV-V FAX: ;973) 377-7464 PHONE Evergreen Recycling Of Corona (EROC) r7181 446-7000 JOB NAME JOB NUMBER Willets Point Boulevard World Trade Center STATE STREET Corona New York ONTRACT NUMBER DArToFEXisfiNG'cONTRA^ CITY STATE New York City New York •e authorized to perform the following specifically described additional work: Cat 246 Skid Steer 191 I Ingersoll Rand Air Compressor Cat 980 Loader Miller Maintenance Trailers Cat 966 Loader 1 a.. X Welders Maintenance Trailers . .JJX Cat 420 Loader A Mechanics /Service Trucks -Ul _ Hitachi 450 w/Grapple I a A Clerical rsonnel _ Hitachi 550 w/Grapple A Foreman _ Hi tachi 750 w/Grapple I a. IO Burners _ Hitachi 330 w/Grapple 3 Laborers LX _ 1. xchi 1200 w/Graple £9 3 Mechanics lA Mobile Power Washer /a 3 Oilers \ X Roll-Off Truck(s) 3” Operators Service Trucks Worki ng Supervi sors ✓ Ia Man Basket I a I Safety Supervisors Tractor Trailer(s) 50 CY Truck Dri vers Trai1er(s)Low Bed

}DITIONAL CHARGE FOR ABOVE WORK IS: $ ment will be made as follows:

)ve additional work to be performed under same coinditions as specified in original contract unless otherwise stipulated.

Authorizing Signature <0WNER SIGNS HERE)

hereby agree to furnish labor and materials - complete in accordance with the above specifications, at above stated price.

horized Signature Date (CONTRACTOR SIGNS HERE)

HIS IS CHANGE ORDER NO. MOTE: This Revision becomes part of, and in conformance with, the existing contract.

CONFIDENTIAL. SUBJECT TO PROTECTIVE CITY 21MCinn OEDEE NO. 2. SEFT, 2„og- nn9niTnc.T “^^°°-°°2013053 NYC-WTC_000237616

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000237616Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000356523

World Trade Center project: date, contract, and job number fields on authorization.

Similar indexed content

Compare copies and versions →