NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 6 pages

Twentieth Floor Clean Up Report, 100 Church Street, April 2003

Machine-extracted title · confidence 95%

Report documenting the twenty-first floor cleanup activities at 100 Church Street prepared for the NYC Law Department.

NYC-WTC_000236594–000236599
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

New York City Law Department Twentieth Floor Clean-up Report

2.0 DESCRIPTION OF WORK

The cleaning performed by Branch Services was performed in four phases. The cleaning included a 11 a ir c onditioning s upply a nd r etum air d ucts, grills, a nd p erimeter i nduction u nits located on the 20th floor. Cleaning of all visible dust from the return air plenum including the top surface of the ceiling tiles. Cleaning of all dust bearing surfaces such as filing cabinets, computers, book shelves, storage boxes, papers, and any other vertical and horizontal surfaces including walls, floors, of all visible dust. All dust cleaning was performed top down using a HEPA vacuuming system and wet wiping with a mild detergent solution. The floor carpet was steam/wet vacuumed with a HEPA filtration system. Cleaning commenced at 6 pm on Friday and was finished for re-occupancy by 7 am following Monday. Affected personnel on the 20th floor were notified prior to commencement of cleaning activities.

The cleaning of cardboard boxes stored within the NYCLD space on the east side of the floor was completed first. The exterior of the boxes were cleaned of all visible dust. Samples for lead in dust were collected to confirm the effectiveness of the response actions. Phase I through IV was cleaned after the boxes were cleaned and moved off the floor. Each phase was isolated for air movement from the rest of the floor. Negative air machines were installed and operated to keep each phase under negative pressure prior to cleaning. TRC collected samples for asbestos and lead concentration in air outside of the isolated work area under each phase.

1 TRC Cuihvnsr-Frtfiiwi firJiiHnnt

NYC-WTC_000236597

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000236597Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000174558

Report documenting the twentieth floor cleanup activities at 100 Church Street prepared by TRC Engineers.

Similar indexed content

Compare copies and versions →