NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 111 pages

NYC-WTC_000233286

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000233286–000233396
Page image
Scanned page image, NYC-WTC_000233294
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(v) Asbestos Material. Any material containing greater than one percent (1%) by weight of asbestos, also known as Asbestos Containing Material (ACM).

(w) Asbestos Project. Work that involves the removal, encapsulation, enclosure, repair or disturbance of friable or non-friable asbestos, or any handling of asbestos material that may result in the release of asbestos fibers. For the purpose of compliance with this Part, an asbestos project shall include any disturbance of asbestos fibers, and the planning, asbestos survey, design, background air sampling, inspection, air sampling and oversight of abatement work, cleanup, and the handling of all asbestos material subject to abatement, as well as the supervising of such activities. Installation of friable ACM shall also be considered an asbestos project. An asbestos project starts with Phase I when the planning, asbestos survey, and design work begins or is required to begin. The project shall not be considered completed until Phase II D is complete. (See Table 1 Below).

Table 1

ASBESTOS PROJECT PHASES OF WORK

Phase I Phase II (Prior to Asbestos Abatement Contractor Mobilization) Abatement- End Pre-Abatement A B A B C D Asbestos Background Regulated Asbestos Final Final Waste Survey, Air Abatement Handling Cleaning & Removal Planning & Sampling Work including,Gross Clearance From Site Design Area(s) Removal or Air Samples Preparation Abatement, & Enclosure Initial Cleans Construction and Waste Removal

Start- Asbestos Project- End

(1) Where any work is subcontracted, only that part of the work involving asbestos shall be deemed to be an asbestos project.

(2) Asbestos projects include Large asbestos projects. Small asbestos projects, Minor asbestos projects, incidental disturbance asbestos projects and emergency projects as defined elsewhere in this Part. For purposes of licensing, certification, notification, air sampling and asbestos survey requirements, asbestos projects shall include in-plant operations.

12 NYCRR56 Subpart 2, Page 8

CITY_21MC100_0 03235028

NYC-WTC_000233294

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000233294Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127792 · Box DEP Box 52

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

Similar indexed content

Compare copies and versions →