Memorandum
Privileged and Confidential
TO: Steve Pasichow
Ron Calvosa
CC: William Rogers
Thomas Thacher
Joe Deluca
FROM; Terrence McDonald
DATE; April 17, 2002
RE: Report on Angel Aerial Invoicing
Introduction
Thacher Associates (TA), as part of our site-wide environmental monitoring role, has
evaluated the invoices submitted by Angel Aerial Corporation, a dust suppression
contractor working at the site. TA’s review included Angel Aerial invoices submitted
through AMEC, Tully/EROC, and Bovis (as well as those submitted through Bovis
subcontractors Grace and Gateway). The total amount of the invoices reviewed is
approximately 2.5 million dollars. The period of time examined consists of October 15,
2001, through January 20,2002. The invoices reviewed were provided by Bovis (for
work performed under their direction), Stier Anderson and Malone (for work performed
under AMEC), and by Decision Strategies (for work performed under Tully or EROC’s
direction).
In performing our evaluation, TA utilized the MEMO distributed by the City of New
York, Department of Design and Construction (DDC) dated October 29, 2001
(Attachment 1), as the guideline for our analysis. TA performed a review of the invoices
with particular focus on: (1) rates charged for equipment utilized at the site, (2) whether
the same equipment/labor was billed in more than one quadrant simultaneously, (3)