NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
18 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Search - 1 Result - APPENDIX A TO SUBPART E - INTERIM TRANSMISSION EL... Page 17 of 38
to dislodge any remaining dust.
i. Equipment used in aggressive sampling such as a leaf blower and/or fan should be properly cleaned and decontaminated before use.
ii. Air filtration units shall remain on during the air monitoring period.
Hi. Prior to air monitoring, floors, ceiling and walls shall be swept with the exhaust of a minimum one (1) horsepower leaf blower.
iv. Stationary fans are placed in locations which will not interfere with air monitoring equipment. Fan air is directed toward the ceiling. One fan shall be used for each 10,000 ft<3> of worksite.
V. Monitoring of an abatement work area with high-volume pumps and the use of circulating fans will require electrical power. Electrical outlets in the abatement area may be used if available. If no such outlets are available, the equipment must be supplied with electricity by the use of extension cords and strip plug units. All electrical power supply equipment of this type must be approved Underwriter Laboratory equipment that has not been modified. All wiring must be grounded. Ground fault interrupters should be used. Extreme care must be taken to clean up any residual water and ensure that electrical equipment does not become wet while operational.
vi. Low volume pumps may be carefully wrapped in 6-mil polyethylene to insulate the pump from the air. High volume pumps cannot be sealed in this manner since the heat of the motor may melt the plastic. The pump exhausts should be kept free.
vii. If recleaning is necessary, removal of this equipment from the work area must be handled with care. It is not possible to completely decontaminate the pump motor and parts since these areas cannot be wetted. To minimize any problems in this area, all equipment such as fans and pumps should be carefully wet wiped prior to removal from the abatement area. Wrapping and sealing low volume pumps in 6-mil polyethylene will provide easier decontamination of this equipment. Use of clean water and disposable wipes should be available for this purpose.
e. Pump flow rate equal to or greater than 1 L/min or less than 10 L/min may be used for 25 mm cassettes. The larger cassette diameters may have comparably increased flow.
f. Sample a volume of air sufficient to ensure the minimum quantitation limits. (See Table I of Unit III.B.S.j.)
8. Ambient sampling.
a. Position ambient samplers at locations representative of the air entering the abatement site. If makeup air entering the abatement site is drawn from another area of the building which is outside of the abatement area, place the pumps in the building, pumps should be placed out of doors located near the building and away from any obstructions that may influence wind patterns. If construction is in progress immediately outside the enclosure, it may be necessary to select another ambient site. Samples should be representative of any air entering the work site.
b. Locate the ambient samplers at least 3 ft apart and protect them from adverse weather conditions.
c. Sample same volume of air as samples taken inside the abatement site.
http://lexis/research/retrieve?_m=e 135f2ca3d266867e53d261 df3205722&_fmtstr=FULL<S... 02/04/2002 CITY_21MC100_012558681
NYC-WTC_000219941
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
18 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149346
A chain of custody cover sheet for air monitoring samples sent to the EPA Region 1 laboratory in January 2003.
15 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
12 shared non-person entities · 1 shared topics · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138897
Internal DEP coordination regarding comments on 114 Liberty procedures and preparation of a response.
6 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000186500
Notice of mandatory pre-bid meeting and background information regarding interior asbestos abatement and monitoring at 114 Liberty Street scheduled for February 2003.
5 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗6 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161167
Forwarded draft Statements of Work for cleaning and monitoring activities requiring review by noon.
Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140330
Details project scope for scheduling, coordinating, and monitoring dust and debris cleanup with air sampling from apartments affected by World Trade Center collapse.
Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140593
Contractual agreement establishing an independent firm to monitor debris cleanup and conduct air sampling.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140337
Details project scope for scheduling, coordinating, and monitoring dust and debris cleanup with air sampling from apartments affected by World Trade Center collapse.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
Similar indexed content
NYC-WTC_000149346
A chain of custody cover sheet for air monitoring samples sent to the EPA Region 1 laboratory in January 2003.
Similar indexed content
NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
Similar indexed content
Similar indexed content
Similar indexed content