NYC 9/11 Public Portal Document
PROJECT MONITOR LOG Part 1
1. Client: 4. Project #: 5. Work Area(s):
3. Proi /^roLAA d k
6. Contractor: 7. Contractors Foreman: 8. ATC Representative: 9. Date:
I- AA V) V' Le S j s.
Type of Project: Full-Containment Tent-Containment Glovebagging Other
Size of Project: Large (> 160 sq. ft., 260 lin. ft. of ACM) Small (< 160 sq. fl., 260 lin, ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 ■ 10) N/A (If already completed)
1 Construction of Decon: Yes No 2. Ceiling Poly: Yes No
3 Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No
5 Removal to establish CBs: Yes No 6. Floor Poly: Yes No
7 Negative air: Yes No 8. Pre-cleaning: Yes No
9 Prep work completed: Yes No 10. Temporary Power: Yes No
11. Other_______________ Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: Yes (Complete 1 - 5) N/A
1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
___ Boiler Insulation Transite Boards Floor Tile Other:
2 Negative air pressure > 0.02 in of water: Yes No 3. Amended water used during removal: Yes No
4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1. 1st Stage 2nd Stage____ 3rd Stage 2. 12/12-hour waiting period after 1st cleaning:
3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No
5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1 /12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1 Construction of Tent: Yes No 2. Pre-cleaning: Yes No
3 Construction of Decon: Yes No 4. Negative Air; Yes No N/A
5 Prep work completed: Yes No 6. Pref-inspection passes: Yes No
Removal:
1 Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation Transite Boards Floor Tile Other:
2 Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
(If Glovebag Removal Check 3 through 8)
3 Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No
5 Amended water used: Yes No 6. Removal included cleaning and encapsulation: Yes No
7 Open/damaged ends of insul sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No
Continued on Back
Form NY-R 1/ni
CONFIDENTIAL, CITY_21MC100_003446178
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000177440
OCR can misread numbers and units. Confirm readings against the page image before using them.