NYC 9/11 Public Portal Document
converted into a storage room with an “encryption door and jamb assembly." (We
could utilize the door and jamb that we eliminated from the rear of the cafeteria.)
I spoke to .Tuan Mejia Tuesday morning and he informed me the aiea is an air
intake space for the generators. The area is adjacent to the water storage room and
abuts the south wall of the building (Vesey Street side). Please consult and advise as
soon as possible.
• The official OEM Logo must be manufactured into emblems to be placed on the
podiums located in the EOC and Press Rooms. The main entrance doors and/or
hallway should also have the emblem. (See enclosed hardcopy and zip disk.)
• Move the television in the cafeteria to the right of its previous installation point.
(Place it above the eliminated doorway.)
• Clarifications:
1. The original plans called for two main entrance lobby elevators to be tied into our
emergency generators on the seventh floor. Has that been done?
2. Are there HEPA filters installed in the HVAC system and backup HVAC system?
• Provide OEM with information re: DCAS’s capacity as a moving agent for our files,
office equipment and incidentals. We plan to pack up the week of December 21st and
physically move on Monday, December 28, 1998. This date is firm!