Meeting Minutes regarding OEM Lease and Design, August 1998

Machine-extracted title · confidence 95%

Summary of meetings between city agencies, landlord, and architects regarding scope of work, lease terms, and preliminary design for the project.

NYC-WTC_000173778–000173779

Folder label: “Minutes of Consultant's Meeting #3

Page image
Scanned page image, NYC-WTC_000173778
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

OEM at 7 World Trade Center

DCAS and OEM met with the landlord, Silverstein Properties, and its prefeixed architect, Swanke Hayden Connell, on August 19* to review the scope of work in order for the architect to submit a fee proposal to the landlord. Also in attendance was EIS, a systems consultant selected by OEM to assist the architect in the design of the Emergency Operations Center. We anticipate the architect to be engaged by the landlord and to commence preliminary design work by the end of August.

DCAS and the Law Defiartment also met with the landlord and its attorney on August 21’* to review the most recent draft lease document prepared earlier this month. Very few major issues remain. The schedule for completion remains (a) submission of the “Notice of Intent to Acquire” in November and approval by the City Planning Commission and City Council in late December, (b) a Real Property Phblic Hearing for approval of the business terms in early January with lease execution immediately thereafter and (c) construction of the office space by the end of March 1998 with construction of the EOC by the end of May.

Courts at 141 Livingston Street

DCAS has had several discussions with the landlord and the landlord’s agent over the last few weeks regarding the landlord’s most recent demand (included in the most recent July 3 T* draft lease) that the City have the right to cancel the lease in whole only, not in part. Previously the City had the right to cancel in part. Since the long term plan is to move these two Courts, Housing and Civil, to two separate locations, ideally the City needs to be able to cancel in part. If we can only cancel in whole, we will need to coordinate the moves of these two Courts to minimize the possibUity of rent being paid on vacate space. Ibis demand remains non-negotiable and a "deal breaker" from the landlord’s perspective. The landlord feels if one Court vacates before the other, the vacated space cannot be marketed successfully to other tenants. It appears that we wiU need to aj^ree to this demand to finalize the lease in the near fixture. If we agree to thus provision now, the lease could be finalized and presented to a real property hearing for approval in October.

NYC-WTC_000173778

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173778Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Minutes of Consultant's Meeting #3, Aug 4, 1998 · Box 7DCAS

NYC-WTC_000173766

Meeting minutes documenting the status of shop drawings for electrical systems and sprinklers at the Mayor's Office of Emergency Management site.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.942

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →