NYC 9/11 Public Portal Document
AUG 14 -90 12:05 FR AMBASSADOR CONSTR. C0212 949 97£2 TO £693640
P.02/07
AMBASSADOR CONSTRUCTION CO. INC.
♦PROJECT:
MINUTES OF CONSULTANT’S MEETING #4
Mayor’s Qfics of Emergency Management
7 World Trade Center
1, 7, & 23rd Floors
Amb. Job #857-5175
DATE; August 11. 1998
PRESENT; Martin Schneider Ambassador
Jack Klein Ambassador
Mark Torre Silverstein Properties
Walter Weems Silverstein Properties
Glenn Pymento DCAS
Bob Mela riff DITT
Josep Domingvez DCAS
Bob Hudson Motorola
Juan Mejia Swanke Hayden Connell
1 SHOP DRAWING STA.TUS
- Ambassador advised that the following drawings are still out for review;
Cable tray, bus duct, safety switch
I I^At'piyt' — Simplex system 2.3 '
Duct drawings 23-3 and 23-4
Preaction sprinkler - electrical
Hardware schaduia---------- -- gvev I y,
"2. PROJIECT STATUS
- Reviewed minutes of 8/4/98. \ 2. VAee
- Ambassador advised of the following:
Layout and framing 85% complete.
Drywall installation is approximately 10% complete.
Sprinkler main and branches 30% complete.
Condenser piping 40% complete.
Duct installation 30% complete.
Plumbing work has started.
Black iron for ceiling to start 8/12/98,
- Ambassador advised that hurricane wall is on hold pending clarifications on electrical
and HVAC from Swanke.
- SPl advised that meeting is scheduled for Wednesday to resolve 7th Floor — INeviClu.
- Ambassador advised that they are coordinating 1 st Floor fuel oil work
-rpt
Continued.,./
317 MADISON AVENUE, NEW VORK, NY 10017, 212 9221020, FAX 212 949 9762