Document log for steel supports and fixtures at 7 WTC,

Machine-extracted title · confidence 95%

Log listing submittals including new steel supports, concrete pads, and fixture locations for the Mayor's Office of Emergency Management.

NYC-WTC_000173670

Folder label: “Architectural Sketch Log

Page image
Scanned page image, NYC-WTC_000173670
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PROJECT NAME OFFICE OF EMERGENCY MANAGEMENT SWANICE HAYDEN CONNELL ARCHITECTS Address 7 World Trade Center Address New York, NY 10017 Date Updated: 10/16/98 Project No. 5576A

Architectural Sketch Log

S-7.1 7TH. FL.NEW STEEL SUPP. FOR WATER TA '9/28/98: !aB NTS 8 1/2x11

:S-7.2 7TH. FL. CONC. PAD @ SWITCHGEAR 9/28/98; AB iNTS 8 1/2x11 ;

FSK-20 PENDANT FIXTURE STEM LOCATIONS EOC 9/30/98 iJG :1/8"=12"8 1/2x 11

FSK-21 : SMOKE DETECTOR LOCATION @ ELEV. LO 9/30/98, JM ,NTS 8 1/2x11

‘FSK-22 I PART PLANS @EOC RM. 9/30/98: JM NTS 8 1/2x11 i : ...... .. r = FSK-23 :CORRIDOR IN MAYOR'S SUITE 10/1/98 :JG 1/8"=12'’8 1/2x11 ' —

. FSK-24 J RCP, CORRIDOR IN MAYOR'S SUITE 10/1/98' JG 1/8"=12'’8 1/2x 11 !

FSK-25 IggwiR # 13 TYP. JAMB. HEAD SIM DETAIL . 10/1/98 JM '3"-12" 8 1/2x11

FSK-E5 ; POWER RISER DIAGRAM 10/2/98 SG 1/8"=12'?8 1/2x 11

FSK-26 NORTH ELEVATION @ PENTHOUSE JM 1/8"=12'18 1/2 X 11

FSK-27 PIPE WALL SUPPORT @ MICROWAVE DISHES JG 1/8"=12'’8 1/2x 11

FSK-E6 23RD. FLOOR-LAN POWER 10/6/98; SG 1/8"=12?81/2x11

FSK-28 PTE CLARIFICATION RM. #23-04, 23-10 I 10/7/98' JG 1/8"=12''81/2x11

FSK-29 NEW SLEEVE LOCATIONS AT 23RD. FLOOR 10/7/98 JM 1/8"=12"8-/2 X 11

;FSK-30 PTE ROOM # 23-16, CONST. ROOM # 23-18 10/13/98 JG ,1/8"=12'‘8 1/2 X 11

S-S-1 1ST. FLOOR BEAM PENETR. 10/15/98 AB 1/8"=12''8-/2 X 11

S-S-2 NOTCH AT EXISTING BEAMS AT 1ST. FLOO 10/16/98 AB 1/8"=12’f8 1/2x 11

S-TS-7 SECTION AT FIRST FLOOR TRENCH area; 10/15/98 AB 1/8''=12''8-/2 X 11

FSK-31 HURRICANE WALL PLAN DETAIL ©PIPE RI 10/19/98 JM NTS 8 1/2x11

T

W:\XXXX\Docs\Sketch Log\SKETCH LOG OEM xIs Printed 10/20/98 9 23 AM Page 2 of 3

NYC-WTC_000173670

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173670Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

RFI log for OEM at 7 WTC, Aug 1998 · Box 7DCAS

NYC-WTC_000173589

Request for Information log tracking inquiries regarding construction issues at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.980

machine-extracted · confidence unavailable · Check page ↗
Field sketch log for 7 WTC project, Aug 1998 · Box 7DCAS

NYC-WTC_000173739

Log of field sketches (FSK) issued between July and August 1998 for the Mayor's Office of Emergency Management project at 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979

machine-extracted · confidence unavailable · Check page ↗
RFI Log for 7 World Trade Center, Aug 6, 1998 · Box 7DCAS

NYC-WTC_000173744

Log sheet tracking RFIs regarding wall offsets and electrical outlet locations at the Mayor's Office of Emergency Management site.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.975

machine-extracted · confidence unavailable · Check page ↗
Drawing log, 7 World Trade Center, Sept 1998 · Box 7DCAS

NYC-WTC_000173622

Project drawing log tracking sheet for 7 World Trade Center Office of Emergency Management facility with drawing numbers, revisions, and remarks.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.972

machine-extracted · confidence unavailable · Check page ↗
RFI Log for 7 World Trade Center, Aug 31, 1998 · Box 7DCAS

NYC-WTC_000173752

Log sheet recording requests for information regarding wall offsets and field conditions at the Mayor's Office of Emergency Management site.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.961

machine-extracted · confidence unavailable · Check page ↗
RFI log for OEM at 7 WTC, Sep 1998 · Box 7DCAS

NYC-WTC_000173573

Request for Information log tracking inquiries regarding construction issues at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956

machine-extracted · confidence unavailable · Check page ↗
RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

2 shared non-person entities · Same agency, volume and box · similarity 0.930

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →