NYC 9/11 Public Portal Document
r ..............................
AMBASSADOR CONSTRUCTION CO, INC.
k. .
MINUTES OF CONSULTANT’S MEETING #8
PROJECT: Mayor’s Office of Emergency Management
7 World Trade Center
1, 7 & 23rd Floors
Amb. Job#S57-5175
DATE: Septembers, 1998
PRESENT: Walter Weems Silverstein Properties
Mark Torre Silverstein Properties
Martin Schneider Ambassador
Jack Klein Ambassador
Glenn Pymento DCAS
Josep Domingvez DCAS
Bob Melaniff DITT
Bob Hudson Motorola
Juan Mejia Swanke Hayden Connell
John Hughes OEM
David Litvin OEM
1. SHOP DRAWING STATUS
- Critical shop drawings out for review:
23rd Floor Dunnage I
Roof Steel . I
1st Floor Fuel Oil Tank Dunnage 1
Panel EDPH-23 t, 1
Woodwork 13, 17-21 1
Duct Drawing 23rd Floor Mechanical Roor^ \
2. PROJECT STATUS
- Ambassador advised that the hurricane wall will delay 23rd Floor completion.
Ambassador to advise of schedule change.
- Ambassador advised of the following:
1st Floor
Ambassador to coordinate chopping and piping for fuel oil tank. —
Fuel oil tank construction to start next week.^
ZtkflQoi
- Demolition complete.
Floor chopping for curb work is complete.-^
Concrete curbs to be poured Saturday, 9/12/98.
Framing and sheetrock to be completed 9/18/98.