Letter detailing scope for graphic annunciator panel and wiring installation.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗A letter detailing the installation of graphic annunciator panels and wiring for generators at the Mayor's Office of Emergency Management.
NYC-WTC_000173254–000173257Folder label: “Mayor's Office of Emergency Management®Bulletin #1 dated 7/24/98”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
ROBERT B. SAMUELS INC.
Mr. Martin Schneider August 1998
2. Leak detection system as per Drawing #El-23. Price: $ 28,175.00 3. Hurricane Dampers furnished and installed by others. As discussed with the engineer by telephone on 8/17/98, north wall to have 13 bays, 4 dampers per bay and west wall 6 bays, 2 dampers per bay. As per Drawing Ml-23 and Sketch #FSK-6 dated 8/13/98, there are approximately 22 Hurricane dampers. 10 dampers to be connected to one circuit, and each damper assumed to be 100 watt lOOV. A total of 9 circuits to be connected to the Asco #917, 9 poles and feeder to the new Asco # 917 from panel ELP-23B1 and to be installed within the same closet. Also to furnish and install override switch in watch command station desk with indicator light to be operated manually. As confirmed by the engineer, these dampers are not supposed to be tied to fire alarm Class "E" system.
4. To furnish and install auxiliary contacts in each circuit breaker of switchboard EDPH-23 as per Drawing E3.01, Note #25 dated 7/24/98. Cost of wiring from each circuit breaker to the Graphic annunciator is included under the Graphic annunciator above. Please see Item #1. Price: $ 1,600.00 5. To change switchboard EDPH-23 from switch fuse to circuit breakers panel due to the space problem, as discussed with the engineer. Price: $ 11,740.00 6. To change the interrupting capacity of Panel EDPH-23M from 65KA to lOOKA. Price: $ 7,080.00 2
352 PARK AVENUE SOUTH / NEW YORK 10010 / 686-6700 / FAX: 213-4089
NYC-WTC_000173255
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000172075
Letter detailing scope for graphic annunciator panel and wiring installation.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172474
Addendum detailing electrical work modifications including service switch, feeder, and fixture upgrades with itemized costs.
Same agency, volume and box · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
Same agency, volume and box · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172502
Addendum #1 from Ambassador Construction detailing electrical and fire alarm system upgrades for the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173453
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
Same agency, volume and box · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171900
Quotation for electrical modifications including panel relocation, transformer work, dishwasher connection, and fire alarm.
1 shared non-person entities · Same agency, volume and box · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168639
Revised change order for electrical work at 7 World Trade Center dated November 19, 1998.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173445
Ambassador Construction submits revised change order for electrical and concrete work at 7 World Trade Center.
Same agency, volume and box · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173881
Revised change order #16 submitted for electrical plan revisions regarding drawing changes at 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168684
Memo submitting revised Change Order #4 for oil tank and annunciator panel work at the Mayor's Office of Emergency Management in 7 World Trade Center.
Same agency, volume and box · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173810
Letter from Ambassador Construction submitting revised Change Order #004 for oil tank cradle and housekeeping pad work at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172098
Letter submitting revised change order #4 for concrete work and panel installation.
Same agency, volume and box · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000172075
Letter detailing scope for graphic annunciator panel and wiring installation.
Filed in the same folder
NYC-WTC_000172474
Addendum detailing electrical work modifications including service switch, feeder, and fixture upgrades with itemized costs.
Similar indexed content
NYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
Similar indexed content
NYC-WTC_000172502
Addendum #1 from Ambassador Construction detailing electrical and fire alarm system upgrades for the Mayor's Office of Emergency Management.
Similar indexed content
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
Similar indexed content