2 Eliminate 1) All Steel walls
2) Replace all Bullet-proof doors with a regular standard doors.
3. Eliminate folding walls in Room 34-44,45, & 46.
r
5.
Eliminate the Safe door.
The estimate to construct the “Hurricane Wall” is disapproved. Eliminate the revised
i
Hurricane wall. Instead extend the original hurricane wall (partition) to the same extent
as indicated on the revised Hurricane wall drawings.
6. Also, please provide us with a cost reduction if the 6000 gallon fuel tank were eliminate!. r
I
and the one-day storage tank has increased capacity for a two-day use. This would
eliminate considerable work on the Mezzanine floor.
^er the Electrical work modifications have been reviewed by the low bid contractor, we woulc
like to arrange a meeting early next week to finalize the total costs reductions and approve the
project costs.
Si,
Richard J, Ramos
Executive Director/DRES
cc: Lori Fierstein JefFKondrat Glenn Pymento
i Joseph Menasce Vinicius Castagnola Martin Schneider
i
Josep Domingvez
i
i c:batbvi/slen/lettsr/gilbflni unermgmt 3
NYC-WTC_000173019
OCR can misread numbers and units. Confirm readings against the page image before using them.