← Document results/7DCAS/Hurricane Wall price revision
Document / 1 page

Price Revision Memo for OEM Construction Project, July 1998

Machine-extracted title · confidence 95%

Memorandum detailing a cost increase of $117,684 due to design substitution for the Mayor's Office of Emergency Management construction project.

NYC-WTC_000173010

Folder label: “Hurricane Wall price revision

Page image
Scanned page image, NYC-WTC_000173010
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DEPARTMENT OF CITYWIDE ADMINISTRATIVE SERVICES MUNICIPAL BUILDING, 17th Floor § NEW YORK, N.Y. 10007 (212) 669-7771 Fax (212) 669-7898

WILLIAM J. DIAMOND IRIS WEINSHALL Commissioner First Deputy Commissioner

July 8,1998

Mr. Jerome Hauer Director Office of Emergency Management 100 Church Street New York, New York 10007

Re: Mayor’s Office of Emergency Management 7 World Trade Center NY, NY Project #96-1346 DearMr^jXier^'^^’

As per your request, we are substituting the revised ‘Hurricane Wall’ approved by this office with the original design of the Hurricane Wall at an additional cost of $117,684.00. The construction cost to the City will now be $11,313,445.00 instead of $11,195,761.00.

Thank you for your cooperation.

Sincerely, ‘

ms Weinshall First Deputy Commissioner

c: Lori Fierstein JeffKondrat Richard Ramos Glenn Pymento Josep Domingvez C:\LUCY\GP\Hauer.doc

NYC-WTC_000173010

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173010Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

DCAS letter on alteration costs, Aug 1998 · Box 7DCAS

NYC-WTC_000167314

Letter from DCAS regarding approved costs and revisions for alteration work on the 1st, 7th, and 23rd floors of 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.926

machine-extracted · confidence unavailable · Check page ↗
Consultant team approval, OEM 23rd floor, Feb 1998 · Box 7DCAS

NYC-WTC_000170841

DCAS approves a consultant team to perform architectural and engineering services for the Mayor's Office of Emergency Management on the 23rd floor.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.911

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000172998 · Box 7DCAS

Memorandum detailing a cost increase of $117,684 due to design substitution for the Mayor's Office of Emergency Management construction project.

Filed in the same folder

Compare copies and versions →