NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Abco Peerless Sprinkler Corporation Fire Sprinkler Quotation
Document / 1 page

Abco Peerless Sprinkler Corporation Fire Sprinkler Quotation

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000172760
Page image
Scanned page image, NYC-WTC_000172760
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

05/19/58 08:15 From: Jim Stanton ABCO Peerless Sprinkler Corp. Fax: 616-294 W3 Voice: 516-294.6860 To: AMBASSADOR CONST. Page 1 of 1 Tuesday, May19,1998 9:09:4S AM

ABCO PEERLESS SPRINKLER CORPORATION 81 SEA UIE1VBOULEFAPD , PORT WASHINGTON, NEW YORK 11050 PHONE: (516) 294-6850 FAX: (516) 294-6823 NEW YORK CITY MASTER FIRE SUPPRESSIONPIPING CONTRACTORS UCENSE WS 3A £ 208A

_________ FIRE SPRINKLER QUOTATION_____ QUOTE ». 607 DATE: 5/19/98

BID TO: AMBASSADOR CONSTRUCTION ATTN. : JACK KLEIN PROJECT : „ mayors office ____ LOCATION- 7W.T.C. FLANS/LATEST DATES : FLOOR (S): lsf,’7TH,23RD FPl.01,2.07,3.23,4.23,5.23,6.23 5/4/98

SCOPE OF JVOnX:

FURNISH & INSTALL ALL SPRINKLER WORK AS SHOWN, SCOPE AS FOLLOWS :■ 309 NEW CONCEALED TYPE SPRINKLERS._____________________________________ 51 NEW UPRIGHT TYPE SPRINKLERS.______________________________________________ 2 NEW PRE-ACTION VALVE ASSEMBLIES._______________________________________ _ 2 NEW FIRE HOSE C.-\BINETS.___________________________ ________________________ 1 FIRE HOSE CABINIsT RELOCATION._______________ _____________________ ________ DEMOLITION OF EXISTING PIPING, INCLUDING BRANCH PIPING ON 23, INCLUDED. ALL PIPING, AS SHOWN, IS INCLUDED._______ ____________________________________ ALL WORK WILL BE PERFORMED ON STRAIGHT TIME *, IN 1 PHASE, BY7:1.4>8r^/ /-(I SHOP DRAWINGS, INSPECTION, AND SIGN-OFF INCLUDED.' * : RISER TIE-INS ON OVERTIME. OUR PROPOSAL FOR THE ABOl^ SCOPEJ^ $135,500.00

INCLUDED: INCLUDED: SALES TAX fin ASBESTOS WORK A. BLDG. DEPT. FILING Ai ELECTRICAL WORK A O.T. DELIVERY CEILING WORK O.T. WORK DEMOLITION Y FIRE WATCH TEMP. FIRE PROTECTION N THIS QUOTE PREPARED BY : JTMSTANTON Y=YES; N--N0 516-294-6830 EXTENSION 206 ALTERNATES, EXCLUSIONS, REMARKS: IF BRANCH DEMO ON THE 23RD FLOOR IS TO BE DONE BY OTHERS, DEDUCT : $ 4,000. WE EXCLUDE INSULATION, ELECTRICAL INSTALLATION._________________________ ALL DEMOLITION IS " TO THE FLOOR " ONLY.

PLEASE BE ADIJSED B-w-g- THAT THIS PROPOSAL --------------- ■■■‘.uxrBi IS VALID FOR A "■ ===-■' PERIOD OF 30 DA YS AFTERasiDATE ==ss=sss:^=^=s= OF QUOTATION. . ................ .......... '■■■ ------------- ----------

NYC-WTC_000172760

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172760Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Ambassador Construction estimate, May 1998 · Box 7DCAS

NYC-WTC_000172758

Blank or partially filled construction estimate form from Ambassador Construction Company for an unspecified project.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171284 · Box 7DCAS

Quotation for furnishing and installing Inergen supply cylinders and piping at the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →