NYC-WTC_000172744
Subcontractor bid for concrete curb and enclosure work on the 7th floor of the Mayor's Office renovation.
1 shared topics · Same agency, volume and box · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗Subcontractor bid for concrete curb and enclosure work on the 7th floor of the Mayor's Office renovation.
NYC-WTC_000172748Folder label: “None”

OCR status: ocr · source: ours
NYC 9/11 Public Portal Document ,MAY-11-98 TUE 12:56 PM #x#@.o.o.o.o.ø.ø.o.a. P.02 AMBASSADOR CONSTRUCTION COMPANY, INC. 41 EAST 42nd STREET, NEW YORK, N.Y.10017 TEL. (212) 922-1020 FAX: (212) 949-9762 ESILMALE DATE MAY II, 1998 SUB-CONTRACTOR L.I.C. CONS'T PROJECT MAYOIS OFFICE TRADE - LOCATION PHONE NO.. SUBS ESTIMATOR FLOOR 7M Elooß- ESTIMATED FOR. M. SNYDeY- ARCHITECT DWG. NO. LATEST DATE SHeeT (20F2) WORK INCLUDED: Y'A FLOOR- Perimeter CurB _200L•F. # в,бо0" Concrete enclosure Around Steel BeAms, 26OLIF #15,000 Concete fAD- EXHAUST Louvres cmu close iN-irmasanny $800 29,50022,30c # 2,500 TOTAL PRICE 24,800 WORK NOT INCLUDED OR ALTERNATES: REMARKS: NYC-WTC_000172748
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000172744
Subcontractor bid for concrete curb and enclosure work on the 7th floor of the Mayor's Office renovation.
1 shared topics · Same agency, volume and box · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172749
Subcontractor bid for concrete curbs, pads, and CMU infill at louvers on the 23rd floor of the Mayor's Office.
1 shared topics · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172783
Blank subcontractor estimate form from Ambassador Construction Company for unspecified trade work.
1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172837
Subcontractor bid for miscellaneous construction work including holes for piping at the Mayor's Office site.
1 shared topics · Same agency, volume and box · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172462
Blank subcontractor estimate form from Ambassador Construction Company for unspecified project work.
1 shared topics · Same agency, volume and box · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172289
Blank or partially filled estimate form from Ambassador Construction Company for a subcontractor trade at the World Trade Center project.
1 shared topics · Same agency, volume and box · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172635
Handwritten estimate form from Ambassador Construction Company dated May 26, 1998, detailing trade work at the World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173055
Filled subcontractor estimate form from Ambassador Construction Company for a construction project.
1 shared topics · Same agency, volume and box · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173083
Estimate form from Ambassador Construction Company for work at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172292
Subcontractor estimate document from Ambassador Construction Company with handwritten entries for trade work and pricing details.
1 shared topics · Same agency, volume and box · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172613
A subcontractor estimate form from Ambassador Construction Company with handwritten entries for project specifics.
1 shared topics · Same agency, volume and box · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172073
Filled estimate form from Ambassador Construction Company containing handwritten details regarding specific construction tasks.
1 shared topics · Same agency, volume and box · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000166926
Detailed technical specification document for generator procurement intended for the Mayor's Office of Emergency Management.
Filed in the same folder
NYC-WTC_000167197
One-page fax transmission log confirming authorization for scope revisions to the Mayor's Office of Emergency Management project.
Filed in the same folder
Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.
Filed in the same folder
NYC-WTC_000167333
Invoice from architectural firm for Mayor's Office of Emergency Management reimbursable expenses related to World Trade Center project, including consulting and transportation…
Filed in the same folder
NYC-WTC_000167334
Invoice for consulting engineering services for Office of Emergency Management plans and specifications preparation at 7 World Trade Center.
Filed in the same folder