NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/BUREAU OF SPACE DESIGN CONSTRUCTION COST ESTIMATE
Document / 1 page

Construction cost estimate for Mayor's Office, May 1998

Machine-extracted title · confidence 95%

Department of General Services form estimating construction costs for the Mayor's Office of Emergency Management at the World Trade Center.

NYC-WTC_000172620

Folder label: “BUREAU OF SPACE DESIGN CONSTRUCTION COST ESTIMATE

Page image
Scanned page image, NYC-WTC_000172620
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SSffT Olivetti FX 2100_ ; 5-14-88 » 8131 12126684107-* 88488752;# 2

DEPARTMENT OF GENERAL SERVICES Wie DIVISION OF BEAL ESTATE SERVICES LEASING. ACQUISmONS AND SPACE DESIGN ADDENDUM #1 TRAPS; Audio Visual- MUMCn>AI.BUlLDINO,20thFloor -Room200ON NEW York; N.Y.to«)7 . p,ll)«9-2<520 WnXXAMX DIAMOND ___________ . ' romYR-KONDRAT CommbfimiT Xerins (hmnlttimer Aatstaa Qmititdetur

BUREAU OF SPACE DESIGN Date 5/27/98 CONSTRUCTION COST ESTIMATE NYC AGENCY Mayor’s Office' ' ' -

AGENCY PROGRAM Office of Emergency Management PROJECT# 96-1346

PROJECT ADDRESS ________ RENTABLE SQUARE FOOTAGE FLOORS

■ . LANDLORDSCONTACT.Kathy Gilibertl phone# 212-406-4020

LANDLORD Silverstein Properties, Inc.

LANDLORD'S ADDRESS 120 Broadway , Ney York, NY 10175

ARCHITECTS CONTACT Joe Aliotta PHONE# 212-219-0059

ARCHITECT Swanke Hayden Connell Ltd. ARCHITECrSADDRESS 295 Lafayette Street, New York, NY 10012

ENGINEERS CONTACT___ Michael Maybaum PHONE# 212-615-3606

ENGINEER Cosentlni Associates LLP

ENGINEER'S ADDRESS 2 Penn Plaza, NY. NY 10121 PHONE#

LOW BIDDER'S CONTACT Frank Papayianis PHONE#. 718-458-3800 LOW BIDDER Ace Audio Visual- \ LOWBIOOER'SAOORESS 33-»9 55th Street, Woodside, .HY 11377

Uss this section only If there is a general subcontractor.

1. ALL AMOUNTS TO BE ROUNDED TO DOLLAR AMOUNTS 2. INDICATE QUANTITIES AND UNIT PRICES WHERE INDICATED 3. ATTACH BACK-UP PAGES IN THE SAME FORMAT FOR ITEMS OF WORK NOT INCLUDED IN THE COST ESTIMATE FORM 4. THIS COST ESTIMATE IS TO BE USED TO DEVELOP AN OVERALL COST COST FOR THE WORK AS INDICATED AND/OR REQUIRED OR IMPLIED BY THE DRAWINGS AND SPECIFICATIONS EXCEPT IT WILL ALSO BE USED AS A BASIS FOR ESTABLISHING UNIT COSTS FOR DELETING . I ANO ADDING ITEMS OF WORK aanr t AT-r- »•»» •TZ'X - NYC-WTC_000172620

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172620Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Roofing cost estimate for 7 WTC OEM space, May 1998 · Box 7DCAS

NYC-WTC_000172850

Bureau of Space Design construction cost estimate form dated May 27, 1998 for roofing and waterproofing work at the Mayor's Office of Emergency Management.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.971

machine-extracted · confidence unavailable · Check page ↗
Construction Cost Estimate for MOEM Space, May 1998 · Box 7DCAS

NYC-WTC_000172596

Bureau of Space Design construction cost estimate for HVAC work and space design for the Mayor's Office of Emergency Management at the World Trade Center.

5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.970

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →